INDUSTRY NEWS
Stillstrom Tackles Offshore Wind’s Biggest Bottleneck With New Standalone
Charging Systems Stillstrom by Maersk, a leader in offshore charging solutions, has launched two new applications designed to address one of the most pressing challenges facing offshore - the reliable supply of electric power for vessels operating at sea.
The Power Hub and Power Tower introduce standalone options that can be deployed independently of turbine infrastructure, enabling flexible charging across both operational and future offshore wind developments. They mark the next stage in Stillstrom’s offshore charging strategy, broadening its portfolio and increasing flexibility in how and where infrastructure can be deployed, alongside solutions already integrated within wind farm assets.
As wind farms move further offshore and increase in scale, service vessels are becoming increasingly central to installation, maintenance and long-term operations. Reliable offshore power is therefore a key enabler for vessel electrification, supporting reduced reliance on maritime fuels, enhanced efficiencies and lower greenhouse gas emissions across offshore campaigns.
The launch builds on the work of Stillstrom’s R&D team, with engineers Koen Legrand and Raymond Bergmann recently recognised as Inventors of the Year 2025 by A.P. Moller - Maersk, reflecting the strength of the company’s innovation. This includes multiple patents across its offshore charging technologies, as well as pending protection for both the Power Hub and Power Tower.
Stillstrom’s Detailed Engineering Manager Koen Legrand, and co- recipient of the award, said: “Our two new monopile systems help to address the sector’s long-standing ‘chicken and egg’ challenge,
April Issue 2026
www.sosmagazine.biz 15
where vessel electrification and infrastructure deployment must progress in step. The Power Hub is a compact, monopile- mounted structure designed for installation within operational wind farms, enabling charging capability to be added to existing infrastructure. The Power Tower is designed for new-build offshore wind projects, with a form that mirrors a turbine foundation and allows installation using standard construction vessels, tools and processes, enabling charging to be integrated from the outset.”
Kristian Borum Jørgensen, CEO of Stillstrom, said: “Our mission is to eliminate vessel emissions, the largest source of CO2 in offshore wind farm operations. Electrification of SOVs is therefore essential if the wind industry is to meet its full decarbonisation potential. What has been missing is the infrastructure to support it at sea. These new solutions give developers and operators practical, scalable options, enabling offshore charging either fully integrated within wind farm structures or through standalone offshore installations.”
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48