search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Beyond vertical conveyors as part of package systems,


the company has supplied in-tunnel and stacker conveyors for many projects – such as the in-tunnel conveyors that traveled behind its Crossover TBM on the Kargi hydro project, in Turkey; and, the stacker conveyor for depositing spoil at the AMR water tunnels, in India. On OFTA, Robbins has supplied the system on a


number of tunneling projects, such as on the Black River Tunnel in Lorain, Ohio. The OFTA system takes place by assembling major


components in a concrete cradle. The system has been successfully used to save months on project schedules, and also benefits projects by reducing shipping costs and man-hours compared to the option of shop- assembled machines, says Robbins.


Top:


OFTA assembles the major components of a TBM in a concrete cradle


Centre:


OFTA save time, and reduce shipping costs and man-hours compared to shop-assembled machines


Left:


A cutterhead at the Black River Tunnel in Lorain, Ohio, USA being lowered into the launch shaft after Onsite First Time Assembly


Fall 2023


| 17


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57