search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
| Piston power


Facilities of 150 MW or more, operating or under construction Name


Location


United Ashuganj Bangladesh Liberty Power Tech Pakistan C7 Cambodia C7 Cambodia Kiel Germany Arun Indonesia Moa Cuba


Ressano Garcia Mozambique Sasolburg South Africa Viana Brazil


La Paz (Baja California Sur) Mexico Eklutna, Alaska USA Antelope Station USA


Capacity MW Fuel 200


200, CC 200 200 190 184 184 176 175 175 173 171


168.1


Lihir mine Papua New Guinea 170 Ceará Brazil


Yanbu Cement Saudi Arabia Clifton Pier Bahamas Rio Negro Brazil


Campina Grande Brazil


King Salmon California Humboldt Bay USA


Planta Arizona Guatemala Sapugaskanda Sri Lanka


Standing Bear Lake PS Nebraska, USA Attock Pakistan


Bangkanai Indonesia Kodda Bangladesh


Samsun I Turkey Aracruz Brazil


Kodda, Gazipur Bangladesh UTE Jaraqui, Tambaqui Brazil


168 167 165


164.9 164 163


162.7 160 160 156 160 155 150 150 150 150 150


Gas HFO


Dual fuel Dual fuel Nat gas LNG HFO


Nat gas Nat gas HFO


Diesel oil


Year of op. Configuration 2015 2010 2021 2021 U/C


2015 2015 2014 2011 2009


Nat gas, LFO 2014 Nat gas Diesel HFO


Diesel oil HFO HFO HFO


20 x W20V34SG


11 x 18V46, CC plant (1xST) 11 × 18V51/60DF 12 x 50DF 20 x J920 19 x 34SG


10 x 18V48/60B 18 x V34SG


18xW20V34SG 20 x 20V32


2009 2013 2010 2010 1963 1998 2010


Nat gas, diesel 2010 Dual fuel HFO, LFO HFO


2008 2003 1984


Nat gas, LFO 2023 HFO


Nat gas


2008 2015


Nat gas, HFO 2014 HFO, nat gas 2003 Diesel oil


HFO


2005-13 4 units, CC plant 10 x W18V50DF 18xW20V34SG 22 x various 8 x 20V46F


15 x 9L58/64


Engine/genset supplier Wärtsilä Wärtsilä MAN ES Wärtsilä


GE Jenbacher Wärtsilä MAN ES Wärtsilä Wärtsilä Wärtsilä MAN ES Wärtsilä Wärtsilä Wärtsilä Wärtsilä MAN ES


1 x 6 MW, 4 x 10 MW, 2 x 26.5 MW, 2 x 33 MW Sulzer, MAN ES 10 x 18V46 20 x 20V32


10 x 18V50DF 10 x W18V50DF 10 x 18V46 16 x 10 MW 9 x 50DF 9 x 18V46 16 x 34SG


9 x 18V51/60DF


2013 2018 2004


18V46s + 1x18V50SG, CC, CHP 17 x 18V32/40 8 x W50, 1xW32


8 x 18V48/60, 2 x 16V32/40 This table of power plants over 150 MW is as comprehensive as we can make it, but it is not claimed to be an exhaustive listing of all such plants worldwide.


Wärtsilä Wärtsilä Wärtsilä Wärtsilä Wärtsilä


SEMT, MAN ES, Siemens Wärtsilä Wärtsilä Wärtsilä MAN ES Wärtsilä MAN ES Wärtsilä MAN ES


Wärtsilä wins two orders totalling 600 MW in Mexico


In November 2021 Wärtsilä contracted to supply Mexico’s state-owned electricity utility, Comisión Federal de Electricidad (CFE), with two large multi-fuel power plants having a combined output of 600 MW. The projects will be delivered by Wärtsilä on a full engineering, procurement, and construction basis. Jointly these projects represent the largest generating capacity EPC contract ever awarded to Wärtsilä. The projects comprise a 400 MW facility, the Mexicali Oriente power plant located in Mexico’s Baja California state, and the Parque Industrial plant, a 200 MW generating unit located in Sonora, Mexico. The Mexicali Oriente plant will operate with 24 x 50DF dual-fuel engines, while the Parque Industrial plant will feature 22 x 34DF dual-fuel engines. The engines will operate primarily on gas with the capability to use liquid fuel as a back-up if required.


The awarded projects provide a clear indication of the demand that exists for flexible power plants of this size. During the summer months they will operate continuously, meeting


the high electricity demand in a region where temperatures can reach +50 °C. For the remainder of the year they will be used to provide grid balancing service. The new plants are to be completed during 2022 and 2023.


Thermal balancing services for Brazil’s grid


In November Wärtsilä contracted to supply three gas engine power plants with a combined output of 150 MW to Brazil. The contract award derived from a Reserve Capacity Auction organised by the Brazilian ministry of Mines and Energy. The three plants are to provide grid balancing duties and will be delivered on a fast-track basis, They are


scheduled to be operational in Q2, 2022. The plant’s output will be fed to the national grid assuring system reliability, for instance, during times of adverse weather conditions. The contracts include, in total, 16 fast-starting 20V34SG gas engine generating sets. The projects will be delivered on an EPC basis to existing power plant sites UTE Luiz Oscar Rodrigues de Melo and UTE Viana 1, as well as a new power plant UTE Povoação 1, all located in Espírito Santo state in southeast Brazil. Wärtsilä gas power plants are said to feature high efficiency at any load, at plant efficiency levels of up to 50 % in simple cycle, and can reach full output power within minutes of start up. They can fire natural gas, LPG, synthetic fuels and various bio-gas fuels, and are switchable. To date, Wärtsilä has delivered 2.7 GW of power plant capacity in Brazil, of which 739 MW are covered by the company’s long-term service agreements.


156 MW of thermal balancing power for Omaha


Wärtsilä is to supply equipment for a 156 MW multi-fuel engine power plant to Omaha Public


www.modernpowersystems.com | January/February 2022 | 37


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45