INTERVIEW | MIKE MCCONNELL


penstock tunnel it was necessary to put in place a temporary mid-point bulkhead. Barry Couchman was the prime mover to install a steel liner below the bulkhead and traditional concrete lift pours above, which again accelerated the works and enabled watering-up on-programme. All the hydros discussed were a variant


of Design and Construction, resulting in then leading up to the Malaysian Pergau project, which, in remote jungle locations, Mike says was a final test of all staff/ companies’ adaptability to these site conditions and Conditions of Contract. Appreciating the Mechanical and Electrical


requirements at an early stage in the contract was critical here. “With the ‘20 years era of Hydros’ I feel that I have learnt a lot in planning and coordination,” he says, “to make things happen on-site!”


Above: Mike presenting the BTS Book to Tunnelling Superintendent Herb Hart, following the NZTS/BTS joint meeting in Auckland in 2024


HALF OF ENGINEERING IS


WORKING WITH AND DEALING WITH PEOPLE; AND WITHOUT PEOPLE SKILLS AND LEADERSHIP THE PROJECT WON’T WORK.


Next was China, and not hydro. “In liaison


with the late Peter Chapman, we proposed the use of TBMs for the Guangzhou Metro system. As usual, the contract was then split up into a number of local contracts and contractors, who soon developed a ‘DIY’ TBM concept for themselves! But it was an interesting experience.” Then, later, Mike turned his focus to the


next generations. “My last three years before retirement,


Above: Many projects with tunnelling works were undertaken in Asia, including in Sri Lanka “After Oman, we moved back to the


UK and I operated out of Balfour Beatty International’s London Head Office, as their Chief Engineer. This involved supporting hydro plants in Sri Lanka, Malaysia and a metro proposal in China. “In Sri Lanka, on the Anglo-Japanese


Hydro Plant, I was working with Barrie Glenn to ensure that our UK designer was producing buildable construction drawings for the power tunnel and


38 | August 2026


powerhouse. This involved both UK visits and longer periods on-site. Excessive water flows in the power tunnel excavation were only resolved by chartering a helicopter and identifying the surface rock dips and diverting the tunnel alignment to minimise water inflows. “In Malaysia, the hydro plant involved a


75m-high earthfill dam, 35km of tunnels and an underground powerhouse cavern. In constructing the 500m-long inclined


I spent as Graduate Recruitment and Engineering Development Manager. Traditionally, that had involved the so- called ‘milk round’ of companies making the rounds of dozens of universities, holding interviews with students about their academic achievements. My own experiences, back as a young interviewee, made me change that. I realised that it was a waste of space; students, not knowing the company or real-life engineering, could only ask nebulous questions, about company cars and the like; we for our part could get only nebulous ideas about the students. “I got rid of the milk round. We focused instead on specific universities. We


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45