Above:


Typical cross-sections of Nové Dvory station


5. EXPECTED SETTLEMENT The NATM design is underpinned by instrumentation— settlements, convergence and other response measures—with trigger limits set for each stage. Predicted maximum settlement above the Escalator Tunnel South, which is the biggest structure in the station, is around 105mm. During the ground movement assessment one building was flagged as critically affected and is therefore scheduled for demolition during the works. The impact on other surrounding properties has been assessed and is expected to remain within acceptable thresholds for settlement and damage.


6. STATION SECONDARY LINING Secondary lining for the station is divided into seven construction sections (DP1-5). The overall construction programme for the secondary linings is determined by receiving two TBMs from the south. When they are being pulled through the station the


Below:


Isometric with elements of anticipated excavation sequence in ‘Dome’ area of Nové Dvory station


pours can proceed for the station sump and the parking track tunnel and its ventilation shaft. After the TBMs have been pulled farther through the station then casting be done for the turnout tunnels, ventilation tunnel and the station ventilation shafts. Once the machines have


passed through to the end of the station then casting of the lift shaft, escalator tunnels and station internal RC structures can proceed. The most challenging geometry for casting the


linings is at the escalator-station connection. Given the three-dimensional geometry at the ‘egg’, a hybrid of form-traveller and bespoke timbering is anticipated to be used, with the final construction methodology defined in the contractor’s design.


7. OVER SITE DEVELOPMENT (OSD) The city of Prague will own the station and the land above it and has created a company for Over Site Development (OSD). The station design is currently being updated to integrate the vestibules within the OSD. The building foundations will be separate from the station, and the depth of below-grade storeys has been limited to avoid overloading. It has been verified that OSD load effects sit within the station design envelope.


8. GEOTHERMAL ENERGY HARVESTING As part of the project, the city is piloting geothermal energy harvesting. A ground source heat pump system consisting of 20mm collector loops will be fixed to the first reinforcement layer in the secondary lining, close to the interface between both linings. The loops will be connected via the South Escalator Tunnel to a heat pump at the basement level of the OSD. Preliminary estimates indicate potential annual supplies of the order of 1250MW to 1500MW per year for heating and 600MW-800MW per year for cooling.


9. OTHER SCOPE Mott MacDonald is also responsible for the design of three other major structures within Section 1b, as follows: 9a. Nadrazi Krc Station Station Nadrazi Krc is an at grade station partially constructed on a bridge above a pond. The station is divided into northern and southern


sections, and a nearby stream will be diverted within a pile structure. The northern part has cross walls to enable the excavation to cross the city ring road in


14 | April 2026


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45