search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
The iNav software is an option - even a retrofitting


one - on Sandvik’s i-series drill rigs. Additional in-tunnel survey equipment is needed, though - such as a Leica total station and wall prisms. The entire system gives more independence to the rig operator, able to work in the cabin through data transfer from the survey kit.


iSURE The iSURE Geo software tool has been launched to help optimise the excavation process in either tunnelling or mining operations by real-time handling of geological data obtained as the faces advance. Both productivity and safety benefits are possible. The software is part of Sandvik’s iSURE software, able to be employed with its i-series tunnelling jumbos and mining development drill rigs. Sandvik says: “It delivers improves understanding


of the local geological environment for optimised underground development mining and tunnelling operations.” How? The software, onboard the rig, draws upon real-time


drilling data to extrapolate and visualise to produce geological mapping information. Sandvik says ISURE Geo cab “assist to identify weakness zones requiring rock reinforcement, optimise use of explosives, plan the optimal location for stope openings, reduce over- and under-break, and produce comprehensive reporting.” Field testing was performed at the Kittila mine, owned


by Agnico Eagle, in Finland. The software was used to validate the existing rock mass conditions - giving “valuable additional information”, says Alexandra Heller, a structural geologist with the mine owner. The result was detailed 3D imagery of rock conditions


and geological properties in the local area. Sandvik says the software can “help optimise the excavation process, anticipate potential challenges


and improve safety through accurate geological information.” Eemeli Bergstrom, another structural geologist


working at the field test mine, noted the benefit of “getting very good quality confirming data”, helping both productivity and safety.


iNAV Sandvik describes the iNav total station as the latest solution it offers for automating drill rig navigation underground where GPS is not available, and can be operated from the cabin by the rig operator - and can have survey data shared with other rigs on a project. It is an optional feature on Sandvik’s i-series drill rigs.


Leica surveying equipment to sit in the tunnel are part of the extras needed. The company says: “The new method streamlines


operations by enabling the operator to handle the navigation independently, even without prior surveying expertise.” From the rig cabin, the total station device back along


the tunnel is controlled directly, enabled by Bluetooth connectivity. This link is compatible with the Sandvik’s DrillConnect


app, it says - an app that transfers data on fixed-point coordinates from the survey computer to the drill rig’s systems. Additionally, such survey data can be shared between


other rigs in working on the tunnels of a project - which, says Sandvik, gives “efficient data sharing and operational flexibility.” The jumbos that the iNav total station is optional on


the i-series drill rigs - the DT923i, DT1132i and DT1232i - and, the company says, retrofitting can also be done. On other kit, the surveying system needs a Leica total station, Leica wall prisms and also a GeoCOM Robotics licence for full operation.


Below:


The in-cabin viewer for the iNav system and the in-tunnel survey system, respectively


Above:


Views on visualisations using iSURE Geo software


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53