NET-ZERO EMISSIONS | NEWS
KALMAR SUPPORTS APM TERMINALS ELECTRIFICATION PILOT
K
almar has signed a contract with APM Terminals Pier 400 Los Angeles to supply two Kalmar electric AutoStrads
and to undertake a retrofit of two existing hybrid straddle carriers. The retrofitted units will be part of
APM Terminal’s $60m electrification pilot. And the order was booked in Cargotec’s Q1 2024 intake, scheduled to start in Q4 2024. “With this pilot we look to gain greater understanding of how to convert our existing hybrid equipment fleet to fully electric with our onsite mechanic workforce,” said Jon Poelma, managing director, APM Terminals Pier 400. “Electrifying straddle carriers is an essential task for us. We’re confident they will be able to meet the significant operational demands of the terminal. We have made the commitment to our customers to decarbonise supply chains and are aiming for net-zero emissions at the terminal before 2030.” The two Kalmar electric straddle carriers participating in the electrification pilot project will feature high-power batteries with an operation time of 45–50 minutes and a charging time of approximately five to six minutes. In the pilot project, charging will be
performed at two Kalmar FastCharge charging stations located on the machines’ working routes. All charging related decisions are performed automatically by Kalmar One Fleet
APM Terminals Pier 400.
Optimiser’s energy management module. “The automated straddle carrier
terminal at Pier 400 in Los Angeles is a flagship reference project for Kalmar and a demonstration of our world-class automation and retrofit capabilities. We are exceptionally proud that APM Terminals has selected Kalmar as their partner for this electrification pilot, which will demonstrate the capabilities of our fully electric straddle carrier,” added
Arto Keskinen, senior VP, Horizontal Transportation, Kalmar. Pier 400, which opened in August 2002, is now the largest container port terminal in the Western Hemisphere. The terminal covers an area of 507 acres and is home to 19 Super Post-Panamax ship-to-shore (STS) cranes. The terminal currently operates a total of 132 Kalmar AutoStrads, all of which have hybrid electric drivetrains.
Kalmar AutoStrads in APM Terminals.
Dockside Lift & Move Supplement | June 2024 | vii
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69