SPECIAL WORKS


allowed articulated lorries to continue delivering materials.


"Due to the orientation of the site access gate it was physically impossible to move the vehicle route away from the ATU and without the chamfered corner vehicle access would have been completely impossible for HGVs," says Mr Bellamy.


"There are two excavators on site, including one 45-tonner, and three lorry deliveries per shift bringing tunnel segments for the tunnel boring machine which meant that our design had to accommodate an increased surcharge of 15kN/m2," explains Groundforce Shorco Area Manager Arpad Nagy.


The excavation is lined with 6m-long GU13N steel sheet piles and braced with three levels of Groundforce's hydraulic Mega Brace frames. Four MP150 modular hydraulic props were installed as knee-braces (ie spanning the corners of the excavation) at all three levels within the excavation - a total of 12 props.


The MP150s are attached to brackets welded to the waling beams.


"These act as shear-stoppers to prevent the props sliding along the beams," explains Arpad.


One side of the excavation runs along the top of the pumping station's 10m-deep foundations.


"The JV had to drill into the foundation of the Grade 2 listed Thames Water pumping station in order to facilitate the installation of gallows brackets required to support the temporary frames," explains Arpad.


The support structure is designed to limit deflections in the sheet piles to within 10mm.


Designing the support system was complicated by the need to chamfer the corner of the excavation, says Arpad: "Once you lose that corner you need to recalculate the loadings and reposition the knee braces."


With the bracing installed, the 800mm-thick base slab was cast. When this had reached full strength, the two bottom levels of bracing could be removed to allow formwork to be assembled for the concrete wall lining.


The top level of bracing is due to be removed when the lining walls have reached 1m below ground level.


Despite the complexity of the job, design and installation of the support system has gone very smoothly.


"Groundforce have served us well on the ATU package, engaging at the design stage, attending site to deliver toolbox talks on the EMV, and generally with how the works were progressing," says Mr Bellamy.


58


High fibre handled by robust Borger Pump


A rotary lobe pump made by Börger has helped solve a wastewater processing problem at a textile manufacturer.


Taking effluent from the bleaching process into a storage tank, the Börger pump has to contend with significant fibrous material that also contains elements of hydrogen peroxide and caustic soda.


When the defined fill level of the wastewater has been reached in the collection tank, the Börger rotary lobe pump automatically conveys the liquid in measured amounts from the collecting tank into the sewage system.


Made of Duplex stainless steel and equipped with a maintenance-free mechanical seal, the compact Börger rotary lobe pump is very easy to service, requiring only basic tools.


| September 2023 | www.draintraderltd.com


The Börger pump has to contend with significant


fibrous material


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76