search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
FLOODS & SUDS


Dry land in sight for Northern Community


A Northumberland community blighted by years of flooding is breathing a sigh of relief after drainage experts stepped in with a green solution.


The three-hectare playing fields surrounding Astley Community High School, Seaton Delaval, were saturated and surface water was pouring overland flooding nearby homes.


But Frank O’Donnell and his team from Groundwater Dynamics stepped in with a carbon-neutral system to alleviate the flooding.


Frank O’Donnell said: “I am really pleased that we came up with a solution for Northumberland Council.


“The fields and hardstanding areas were affected during heavy and prolonged rainfall causing significant flooding and damage to properties by surface water


north of the site.”


The Groundwater Dynamics specialists carried out test drills and found infiltration rates at four different depths up to 12 metres below the ground.


Mr O’Donnell added: “Following the test drills we designed an ECO-90 infiltrator system capable of dealing with large volumes of flood water at source without the need to connect to public storm drains or combined sewers.


“These are carbon-negative sustainable drainage units which will allow water to drain away deep below the surface of the fields.”


A total of 1440 ECO-90 infiltrator devices were used and the system can handle 900 cubic metres of storm water with a half drain down time of less than 24 hours which will prevent flooding to the


properties to the north of the site.


The seven-strong team completed the £120,000 project on time and on budget during term time at the school.


Northumberland County Council’s Flooding Programme Officer David Green said: “This has been a problem in the area for more than 10 years and Groundwater Dynamics gave us the opportunity to prevent flooding from surface water without relying on storm drains that just don’t have the capacity to cope with the increasingly intense rainfall events we’ve seen in recent years.”


42


| September 2023 | www.draintraderltd.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76