EAOL will maintain good public relations with local residents that may be affected by the construction works. A Project Community and Public Relations Procedure will be submitted to the relevant local planning authority, as part of the Code of Construction Practice, in fulfilment of Requirement 27 of the DCO. Community relations will be co-ordinated on site by a designated member of the construction management team. A proactive public relations campaign will maintained to keep local residents informed of the type and timing of works involved, paying particular attention to potential evening and night time works and activities which may occur in close proximity to receptors. A combination of communication mechanisms such as posters and parish meetings will be employed to keep local residents informed. Further details are provided in the Outline Code of Construction Practice, a certified document under Article 33 of the DCO.


2 6 Structure of Document


The preferred Onshore Cable Route and cable installation technologies have been carefully designed to reduce the potential for significant impacts on ecological receptors and to minimise impacts on landscape features such as trees and hedgerows.


7


This Strategy is therefore structured by receptor, and details mitigation and enhancement measures for each ecological receptor individually. Under the heading of each receptor, there is an overview of baseline and embedded mitigation, then further discussion of additional mitigation. The discussion of additional mitigation is structured chronologically to outline the mitigation/ enhancement measures which would apply at each stage of construction/operation:


Pre-construction During construction Post-construction.


8


The assessment detailed within the ES was based on inclusion certain measures as „embedded mitigation‟. This is defined in Chapter 4 of the ES as „mitigation measures that were identified and adopted as part of the evolution of the project design and were included in the Project Design Statement that described the project as assessed in the Environmental Impact Assessment (EIA)...‟


Outline Landscape and Ecological Management Strategy. Version 2


Page 9


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129