UK Architects for eco house manufacturer Baufritz
house, the process is very similar to any self-build project. The key differences are that the builder is already known, they are an integral part of the project from the very start, and the house elements are manufactured in a factory using Modern Manufacturing Methods to create prefabricated modules. These modules are transported to the client site and erected, where all the pieces fi t together perectly to reveal the completed house.
W Most experienced self-builders will
recognise the Baufritz Architectural process. It starts with an initial feasibility study to understand the viability of the project. Here cost implications are understood which means alternative design approaches may be necessary. They then create the outline proposal where Baufritz can work through the client’s ideas. Once the design is chosen and initial cost analysis completed, the house price is agreed before the plans are submitted to planning. This ensures that there are no nasty surprises in terms of build costs, once planning consent has been granted. This is where most traditional build projects start to go wrong. As the project price is agreed, the client can proceed, with the assurance that their overall budget will not be exceeded.
Once planning has been granted the client then starts engaging with the actory to fi nalise the details o their project.
Baufritz has taken this method one step further to include all the interior elements, resulting in a completed
hen clients start their self- build project by deciding on a prefabricated timber frame
house which is designed, manufactured and shipped like a giant jigsaw puzzle with detailed plans. Everything from taps to tiles is included. When an architect and client use a pre-fabricator like Baufritz, their approach should be slightly different from other building methods.
A good analogy is with a car
confi gurator. irstly, you start with an idea about the kind of car you want, then you select all the elements that make up your car (engine, wheels, trim levels etc. nce youve confi gured your car it’s then sent for manufacturing. Sometime later your car arrives adhering to the confi gurations reuested, at the price and date agreed. Baufritz has used this idea for their latest innovation - “My Smart Green Home”. This is a digital platform to help clients develop their house. Individual elements are selected and brought together using supported confi gurations. Room layouts, fi nishes and the location of elements are completed in a 3D rendered house. The vision here is to allow clients to work through their ideas before incurring costs or making expensive changes to their completed designs. The Design centre in Germany is
where a client can select the materials, fi nishes, fi tures, and fi ttings. This is also where they can start to engage with the interior designers to fi nalise their interior layout. The experience of Baufritz is invaluable to a selfbuilder. Their research and development can optimise materials and space to get the most out of the design. Once the details have been agreed the client will sign a fi nal uild contract that considers any changes the client may wish to make during the sampling process. The Baufritz Architect works with the factory to create a set of handover drawings. These are determined y uilding Regulations and include specifi c details such as wall thickness and type, as well as structural loading information.
The Factory then takes the Building Regulation rawings and uses these to generate a set of Level 1 manufacturing plans which defi ne the modular elements to millimetre accuracy. The Computer-Generated Level 1 diagrams are used to manufacture each
18
www.sbhonline.co.uk SBH07_Baufritz_FPAdv.indd 1
modular element, some of which are automated using the factory’s robotic tooling, others are completed by skilled crat people on the actory oor. As the house is manufactured using a certifi ed uality control process, high uality is guaranteed. The creation o each element ollows a predefi ned series of manufacturing steps resulting in a ully tested fi nal product. uality Control is crucial to ensure that any discrepancies are identifi ed early in the process. It is a well-known fact that any faults that must be corrected on site or later in the build process, cost in terms o uality, time, and money. auritzs rigorous uality anagement process ensures any aws are designed out early on to prevent this. Once the modules are completed, there is a high level o certainty that they will fi t together perfectly as the manufacturing process is exact to the millimetre. This is important because low energy houses must not have any air gaps or thermal ridges. When everything fi ts together perfectly it makes construction a much simpler and uicker process. Baufritz is continuously improving its houses. Their latest innovation, the modular plant room, is a prefabricated unit containing all the house’s technology elements. Namely heating and electrical systems including Battery and PV controller, home networking and entertainment system. It is also possible to include washing and storage space. Completed in the factory and delivered to site, the unit reduces the need for highly skilled on-site specialists. The best way to understand the
process is to book an appointment and meet with our team whose ofi ces are in Girton, Cambridge.
01223 235632
www.baufritz.co.uk
13/07/2022 11:25 jul/aug 2022
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68