34 PROJECT REPORT


leaching into the water table. Boreholes made in the sandy soil identified the extent of the contamination, and part of the soil was excavated and removed, and the remaining groundwater was chemically treated to “neutralise” it, while the oil sitting on it was skimmed off using special equipment. The Environment Agency had to sign this off prior to construction starting, but not before Cameron Homes had inserted piles to protect part of the site following the disturbance caused to the soil. Cameron Homes weren’t fazed by this task, having done extensive decontamination on several sites previous to this one. They use external consultants due to the specialist nature of the work, but “tend to use local contractors who have good knowledge of the local environment officers, says Morrissey.


HOMES’ SPECIFICATIONS


The 20 private sale units comprise three, four and five-bedroom homes, ranging from 1,156 ft2


to 2,083 ft2 , with prices


DESPITE THE SITE BEING LONG AND THIN, “BECAUSE THEY’RE QUITE WIDE PLOTS, THEY DON’T FEEL THAT TIGHT”


WWW.HBDONLINE.CO.UK


ranging between £425,000 to £635,000. Cameron Homes used its ‘Home Sell’ scheme, whereby it helps owners sell their existing homes in order to raise capital for the new purchase, to assist several buyers here. ork started in ovember  and locals were happy to see the cement works removed. The 20 plots went on sale in July 2021, shortly followed by a show home in August 2021, and the development is now at 100% occupancy with the last completion in April 2022. The homes all offer spacious, light and airy living accommodation with energy efficient heating including programmable thermostats that allow customers to set heating schedules based on their daily routine, and what Cameron Homes calls “proper insulation and sealing” to


ensure that heat is retained. There is also a zoning system that divides the home into different heating zones, allowing customers to control and use heating in spaces as required. The show home had a trial PV array on the roof, “just to get a handle on our own running costs and compare with other sites,” Paul comments, adding that “obviously it works really well when homes have a high daytime use.” Although PV was an option for buyers, in the event none chose to take it up at Chaucer Mews when the homes were released for sale. Morrissey says: “For a housebuilder, it’s difficult to upsell  as you need to have them really early in the process; they need to be committed to the house financially and be mortgageable. t doesn’t really work to sell it as an extra.” Cameron Homes is however now selling a range of sustainable homes driven by the 2021 tightening of Part L, with PV and battery storage, plus various upgrades to the fabric of the building.


ome of the specifications did, for pragmatic reasons, see Chaucer Mews go beyond the Regs requirements. Due to noise from the railway, trickle vents were not an option, so an MVHR system was used to provide fresh air internally, plus acoustic glazing. In addition, waste water heat recovery was also installed, making the homes compliant with new Part L. The homes have open plan kitchen/ diner/living spaces situated to the rear of the ground floor, and the rear gardens are accessed by French doors in the main, and some of the five-bed homes have bifolds. The latter also has two bedrooms with ensuites plus a family bathroom. The landscaped front gardens sit alongside paved driveways, and powered garage doors were offered as an extra. he standard of internal finish is very high, befitting the customer demographic


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100