search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
26 PROJECT REPORT: RETROFIT & REFURBISHMENT OR REGENERATION


Balcony Fire-safety Remediation Project in London, 3D & CGI Concept Artwork Crucial to Planning


with many leaseholders facing severe levels of uncertainty regarding the fire safety of their homes. Aluminium has proven to be an ideal solution, offering many building owners a cost- effective and future-proof alternative. We spoke to Richard Izzard, managing Director of aluminium decking manufacturer AliDeck, to find out more about a recent remediation project in London. There are thousands of buildings across the


T


UK currently in need of improved fire safety standards following the Grenfell disaster. With Building Regulations under continual review, meeting the demands of compliance requires precise attention to detail. River View Heights in London, located on the south bank of the River Thames, is a beautiful apartment block with some unique details in the external walls. Distinctive Juliet balconies alongside curved walk-on balconies create a bespoke presentation. The timber decking on the existing balconies


was in dire need of replacement. The building owner took the pro-active decision to switch to aluminium, a non-combustible and fire-safe material, preventing any future remediation to the balconies.


HIGH-END CONCEPT ARTWORK PROVES THE CASE FOR ALIDECK ALUMINIUM


DECKING An in-depth proposal for the replacement of the combustible material, included the use of 3D animations and CGI renders to demonstrate the design, functionality, and versatile nature of the AliDeck System. This concept artwork also proved that the use of AliDeck boards in the Juliet frontages would


allow for the visual styling of the building to be uncompromised, a crucial factor due to the prominent location in a key conservation zone near Tower Bridge. Richard Izzard, managing director of AliDeck,


said, “As the curved Juliet balconies on the building are highly bespoke this was no easy feat. Thankfully, our first-rate design team were able to produce the visual collateral required to bring our proposal to life. Suitably reassured, the building owner felt happy to move forward with AliDeck.” Animations highlighted how the existing,


non-compliant timber decking could be removed leaving the frame in place, and how colour-matched aluminium boards could act


as a direct replacement. AliDeck were able to specify the precise material required to achieve the best outcome in the most cost-effective way. “Our in-house resource for product


visualisations was crucial for this project,” Richard continued. “With a 3D artist and animator in our marketing team working closely with our engineering team, the process of creating detailed renders and animations for the project proposal also managed to identify problems that wouldn’t have otherwise been picked up on ahead of installation.”


HELPING ANOTHER BUILDING BECOME


FIRE SAFE AliDeck aluminium decking boards are fully compliant to the latest Building Standards and have a Fire Resistance rating of A2-s1, d0 & A2fl-s1, which will pass an EWS1 certification. New drainage systems were introduced


to the balconies by using drainage channels, directing rainwater away from the building and to the balcony edge for controlled evacuation, eliminating the possibility of water ingress into the building and avoiding nuisance to people below. “Our Approved Installers, Alu-Installations


Ltd, were contracted to replace the timber decking and replaced them with our aluminium decking boards,” concluded Richard. “We take a great sense of joy in supporting their continued growth and success. Their first-rate level of workmanship is highlighted in the complex nature of this project.” It’s great to see the excellent outcome on this headline project. Clearly, the close collaboration between AliDeck and all stakeholders in the planning and preparation of the works paid dividends and should be used as a template for others to work within in the future to ensure project success.


01622 534 044 www.alideck.co.uk


HBD08_Alideck_FPAdv.indd 1 WWW.HBDONLINE.CO.UK


29/07/2022 12:13


he construction industry continues to be driven by the urgent need to remediate multi-storey, multi-occupancy buildings,


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84