82 INTERIORS
THE FIRST STEP IN ANY FLOORING INSTALLATION SHOULD BE TO CHECK THAT THE SUBFLOOR IS SUITABLY SOUND, SMOOTH AND DRY
rolling, so it is best to check the manufacturer’s instructions. he temperature of the oor must also be maintained above 10 throughout the application and drying of the adhesive, and under oor heating should be turned off for at least 48 hours before, during and after application to enable full bond strength to be achieved.
ideal for where intricate designs or patterns are being created. Pressure sensitive adhesives are available with a variety of other specialist attributes, including the ability to hold vinyl oorcoverings fi rmly in place in areas exposed to extreme temperature uctuations from -20 to 60, such as conservatories and other heavily glazed areas subject to solar gain.
It is important to remember that some adhesives require rolling with a paint roller that has been coated with the adhesive to atten the ridges formed by application with certain kinds of trowel. This is to reduce the incidence of these trowel ‘serrations’ shadowing through thin vinyl oor coverings and affecting the appearance of the fi nished installation. owever, some adhesives do not require
COMPATIBILITY CHECK Finally, it is highly recommended that contractors always check the compatibility of particular oorcoverings and adhesive. To do this, you can consult the oorcovering manufacturer’s guidelines.
Neil Sanders is technical director at F. Ball and Co
Unrivalled national supply & installations
Designer Contracts are one of the UK’s largest flooring contractors, their unrivalled national supply and installation service is delivered via their 15 regional warehouses and supported by their own national distribution centre that holds in excess of £3m worth of stock. No other flooring contractor can offer this capability
on a such a scale. Since they started serving the new build market back in 1992 they have become a trusted partner to many housebuilders and developers, both large and small. Their experience means that they under- stand the market and can do as much as they can to help you be successful.
01246 854577
www.designercontracts.com F. Ball supports centre renovation HBD04_Designer
Contracts_PR.indd 1 31/03/2022 14:56
Products donated by F. Ball and Co. Ltd. including the company’s Stopgap 1200 Pro levelling compound, have been used to prepare subfloors as part of the renovation of the Coventry Caribbean Community Centre prior to its reopening to coincide with Coventry’s UK City of Culture status last year. Commenting on the project, Paul Ager,
Amtico technical training instructor, said: “We were very pleased to offer our expertise to help with this invaluable community project. Using F. Ball’s Stopgap 1200 Pro meant that we didn’t have to mechanically prepare the subfloors, saving time and avoiding disruption to other trades, helping to complete the renovation in the allocated time frame.”
01583 361 633
www.f-ball.co.uk WWW.HBDONLINE.CO.UK HBD04_F. Ball_Interiors - Floors & Floor
Coverings_PR.indd 1 31/03/2022 15:02
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92