58 BUILDING FABRIC; FINANCE & INSURANCE Sapphire Balconies bring urban village design to life
bespoke balconies designed, manufactured and installed by Sapphire’s team of experts. The project’s key design challenges were to improve privacy for residents and reduce the eff ect of wind felt on balconies to higher fl oors. Since specifying laminate glass balustrades to address these concerns was not an option due to the combustible cladding ban, Sapphire worked with the project architects to devise a solution that would maintain both compliance and aesthetics. Sapphire’s designers created a unique balcony solution featuring vertical bar balustrades with an internal and external mesh panel to the bottom, together with matching privacy screens. A bronze metallic powder coating to balcony guarding, toprail and fascia trim adds a unique fi nish that complements the warm tones of the façade and gives the whole building a golden glow. Balconies for Acton Gardens were produced
T
using Sapphire’s Glide-OnTM aluminium Cassette® system utilising the latest off site manufacturing techniques. Having tested the balconies against the highest specifi cations and quality standards, Sapphire’s logistics team ensured smooth delivery of the preassembled Cassettes® to site, ready for installation. Upon ar- rival, balconies were lifted out of the lorries and installed directly onto the pre-erected support arms, reducing time and eff ort on site.
he architectural vision for Acton Gardens, an award-winning urban village in West London, has been brought to life with 87
Using Sapphire’s innovative Glide-On™
balcony Cassette® system at Acton Gardens had numerous benefi ts for the project contractors. It helped reduce time on site as balconies arrived on site fully assembled, cutting down on installation time. Delivering the balconies just before installation also minimised the need for on-site storage. Additionally, producing Cassettes® in a factory environment ensured a high level of quality control during manufacturing and assembly.
HBD04_Sapphire_External Envelope - Balconies &
Balustrades_HPAdv.indd 1
Off site manufacturing also helped reduce
costs while increasing the quality of the fi nished balconies. As a further benefi t, Sapphire’s Glide-On™ method of balcony installation reduced the duration of scaff olding on-site, re- sulting in a direct cost saving to the contractor. The easy installation process also eliminated the need for workers on-site, minimising the risks involved while working at height.
0344 88 00 553
www.sapphire.eu.com 02/03/2022 12:11
WWW.HBDONLINE.CO.UK
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92