search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
66


EXTERNAL ENVELOPE


Garador’s solar energy system outperforms expectations Garador has announced that its solar based energy system is outperforming all expectations.


Last summer, Garador installed a vast array of 1600 solar panels on the roof of its Somerset factory as part of the company’s long-term strategy to reduce the company’s carbon footprint. The latest reports coming in now show that even during the winter months, Garador’s new renewable energy system has been steadily outperforming predictions and expectations.


Garador’s Managing Director, Jon Watson says: “With the latest fi gures in, we are delighted to see that our solar energy system is continuing to make a strong contribution to our power requirements. With the strong benefi ts of helping to reduce our carbon footprint and also keeping our overall manufacturing costs down; without doubt our plan last year to invest in solar energy was the right decision.”


01935 443 700 www.garador.co.uk ADF03_Garador_External Envelope - Garage Doors_DPR.indd 1 Wraptite® 29/02/2024 12:18 offers protection for innovative ecological house in the Outer Hebrides


The Wraptite external air barrier system from A. Proctor Group has provided the signifi cant benefi ts of airtightness, enhanced build quality and protection from the elements for a sea loch facing property on the isle of North Uist in the Outer Hebrides. 7-22 Systems Ltd, an ecological construction business has built a small house and artist’s studio utilising its unique, ecological, prefabricated offsite building system. The key requirements for the project at 27 Locheport, North Uist, included the speed of assembly, excellent insulation values, lots of natural light and the effi cient use of space. Alex Durie, architect and co-founder of 7-22 Systems explained: “Using Wraptite, 7-22 Systems could pre-apply the breather membrane to each prefabricated component in their dedicated controlled workshop setting. The A. Proctor Group pre-cut the rolls to match the sizes of the external faces of each component, and then Wraptite tape was applied on-site to lap between the components. Wraptite has enabled 7-22 Systems to build to even greater quality, add another facet to their prefabrication, and provide the system with the breathable construction.”


01250 872261 www.proctorgroup.com ADF03_A Proctor_External Envelope - Membranes_Double PR.indd 1 12/03/2024 14:30


WWW.ARCHITECTSDATAFILE.CO.UK


ADF MARCH 2024


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84