search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
50


EXTERNAL ENVELOPE


Elephant Park balcony order provides ‘jumbo’ logistics challenge


S


apphire is bringing residents of two major apartment buildings in a new London development their own bit


of ‘open space’ with offsite-manufactured balconies.


Part of Lendlease’s massive


Elephant Park redevelopment at Walworth, south of the Thames, buildings H4 and H5 were built to designs by architects Alford Hall Monaghan Morris.


Designs for H4 and H5 included balconies – 235 and 184 respectively – to be manufactured offsite. The chosen specialist manufacturer was Reading-based Sapphire Balconies,


whose products incorporate


the best in materials and technology with minimal environmental impact. The project brought interesting challenges that sparked fresh thinking and led to new solutions. Delivering


more than 400 balconies


– mostly to a standard specification, but some with variations – to two installation subcontractors


working on the adjacent buildings, meant Sapphire had to adapt its


usual central London delivery strategies. To comply with the site’s traffic management plan – and to minimise difficulties on congested local roads – Sapphire prioritised manoeuvrability over capacity and switched from articulated lorries to smaller rigid vehicles. This had the added advantage of reducing pressure on site space for holding the balconies ahead of being craned into position. For these two buildings,


Sapphire


manufactured a total of 419 Glide-On™ aluminium Cassette®


balconies, all featuring


a new extruded handrail profile and vertical bar balustrades to the architects’ specification. Most of the balconies had controlled drainage, with rainwater channelled down 400 mm soffit trays to discharge on the outer edge – preventing staining of the facade or flooding of balconies beneath. However, some of the balconies had guttters along the front to avoid splashing passers by. They were all designed originally without soffits,


ADF03_Sapphire_External Envelope - Balconies & Balustrades_Half Page Advertorial.indd 1


but some of these were added later where necessary to ensure compliance with updated fire safety regulations. Some balconies were also provided with privacy screens. Inset balconies were provided for a single stack on one of the buildings.


sales@balconies.global www.sapphire.eu.com


01/03/2022 09:08 Petrarch celebrates with photo competition


Petrarch, one of the fi rst engineered stone rainscreen facades, celebrates turning 50 this


year! Since 1972, over


1,000,000m2 of this aesthetically striking panel has been specifi ed for more than 1,000 buildings across commercial, residential,


education, healthcare and


transport sectors worldwide. To mark the anniversary, Architectural Panel Solutions (its manufacturer) is holding an architectural photo and drawing competition with chances to win three special golden tickets throughout the year. The prize consists of a hot air balloon ride for two.


01424 852 641 petrarchpanels.com ADF03_Petrach_External Envelope - Cladding & Facades_PR_converted 1 Alleviating traffi c problems at Herlev Hospital The of the car park has been


01/03/2022 14:21


To alleviate the traffi c problems at Herlev Hospital in Denmark, a multi- storey car park has been constructed with more than 500 parking spaces, primarily for hospital staff. facade


constructed from more than 3,000 m2 of expanded metal, manufactured and


supplied by RMIG. The expanded metal has been anodised and with its dark bronze nuance, fi ts in well with the surrounding hospital buildings. The panels have been staggered to create a variation on the facade.


01925 839 610 www.city-emotion.com


WWW.ARCHITECTSDATAFILE.CO.UK


ADF03_RMIG_PR.indd 1


ADF MARCH 2022


21/02/2022 12:17


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84