search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
APPOINTMENTS & COMPANY NEWS 23


Verta column casings go public C


reating practical and attractive interiors is never an easy task, but for public buildings, the challenges can be even more acute, as the design often must be resilient enough to cope with high levels of footfall and the associated risk of accidental damage.


This is particularly true in the leisure, health and education sectors, as well as local authority buildings and service centres, where the combined demands for durability, practicality and aesthetics all need to be met. Encasement’s Verta column casing range provides architects and contractors with an unrivalled scope of materials and fi nishes and are already widely used in a range of public sector projects.


Local authority buildings Metal column casings from Encasement’s ‘Forma’ range were chosen by Brighton & Hove Council to conceal structural columns, whilst also forming part of an integrated circular seating arrangement at a fi ve storey customer services centre in city.


Bright colours have been used throughout the centre’s interior design and the column casings are fi nished in a RAL 5015 blue polyester powder coated (PPC) fi nish, which contrasts with the bright green seating and interior decor to help guide visitors to the correct area.


Brighton & Hove Council


Grange Primary School, in Halesowen, and Farnborough Sixth Form College to conceal structural elements and improve aesthetics. At Liverpool University,


eight circular


plywood casings are used in the cafe area to conceal existing features located around the perimeter, while a further nine 250 mm diameter casings are used as part of a high- level table design built around existing structural columns.


Healthcare Maidstone’s New Line Learning Academy Education


Encasement casing solutions are installed in numerous schools, sixth form centres and higher education projects across the UK.


Dumfries & Galloway Council’s


Heath Hall Primary School was one of the fi rst to use Forma metal column casings to conceal exterior structural supports, while at Maidstone’s New Line Learning Academy, Forma casings also help create a feature entrance to the front of the building. Square


and rectangular ‘Quadra’ pre-


formed plywood column casings are used extensively in public areas at both Howley


ADF06_Encasement_FP ADV.indd 1 ADF JUNE 2023 Blackpool’s Moor Park Health Centre


01733 266 889 www.encasement.co.uk


05/06/2023 13:15 WWW.ARCHITECTSDATAFILE.CO.UK


The healthcare sector is major user of Encasement products, including hospitals, health centres and special care facilities. For Blackpool’s Moor Park Health Centre, 26 column casings were supplied to the facility including a unique, 7 metre high elliptical casing, from the ‘Polyma’ range. Manufactured from glass reinforced polymer (GRP) the bespoke manufactured casing provides a striking aesthetic feature to Moor Park’s spacious reception area, yet is also extremely durable and resistant to damage.


Elliptical ‘Polyma’ GRP casings are also being used at a 40 bedroom Extra Care facility, which is operated by Boston Mayfl ower housing association in Lincolnshire for people with specialist care needs. Measuring 800 mm x 500 mm and standing 2.7 metres high, the casings conceal internal structural column and rainwater harvesting pipe work.


Gateshead International Stadium Sports & leisure


At Gateshead International Stadium, Encasement supplied and installed 16 ‘Circa’ pre-formed plywood column casings, fi nished in a brushed aluminium Formica DecoMetal® laminate, to conceal structural columns in the reception and main entrance foyer. Six of the 350 mm diameter column casings are 7 metres tall and are located adjacent to the building’s main curved glass facade, while the remaining 3 metre high casings are installed in the ground fl oor cafe bar area and upper gallery level.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70