50


EXTERNAL ENVELOPE


Sapphire’s innovative solutions ensure rapidly installed, rigid balconies for development


A


s industry leaders in prefabricated balconies backed by the brand promise to be rigid, ready and right, Sapphire has overcome challenges posed by a new residential project in one of London’s most notable suburbs. Phase 1 of the White City M&S development by leading property developer, St James, part of the Berkeley Group, features 342 balconies designed and manufactured using Sapphire’s innovative offsite-manufactured Glide-On™ aluminium Cassette®


system.


To complement the new apartment buildings’ intricate façade detailing Sapphire created a bespoke balcony package with Crystal®


frameless, structural glass balustrades. As well as meeting the project’s design challenges, Sapphire’s team maintained clear and frequent communication with the supply chain throughout. Additionally, the use of Sapphire’s Balcony Passport System, a quality control app, provided a complete traceable history of each balcony, from assembly to final


quality acceptance, delivery and installation, thereby reducing the potential for snagging at the point of client handover. The prestigious White City project specified Sapphire’s Glide-On™ Cassette®


balconies


with clear toughened laminated structural glass, polyester powder coated aluminium fascia trim to conceal glass fixings/edge of the balcony frame, controlled draining soffits, and composite decking fixed with hidden clips. While the balcony units were preassembled offsite,


cast-in anchors and incorporated ADF01_Sapphire_External Envelope - Balconies & Balustrades_HPAdv.indd 1


thermal break connections offering superior rigidity to the balconies, were cast into the building slab. Contractors working on site reported that the anchors were on a par with the best in the industry. Sapphire’s offsite manufacture and storage package, which meant balconies could be kept in storage for an extra six months due to project delays, was seen as a huge positive to the project. When they were required on site, the preassembled balconies, including balustrades, decking and soffits, were transported with balconies ‘nested’ onto each pallet, making transportation both cost-effective and safe. Balconies were pre-slung offsite and ready for fast and easy installation upon arrival. Once lifted into position, the Cassettes®


simply


Glide-On™ to the pre-erected galvanised steel support arms before completing the simple mechanical fixings.


sales@sapphire.eu.com www.balconies.global.com


14/12/2022 12:29


WWW.ARCHITECTSDATAFILE.CO.UK


ADF JANUARY 2023


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76