search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
38


PROJECT REPORT: EDUCATION & RESEARCH FACILITIES


PROJECT FACTFILE


Architects: Jestico + Whiles Executive architects: NBBJ Structural engineer: Ramboll M&E consultant: Hoare Lea QS: AECOM


Accessibility consultant: David Bonnett Associates


Landscape consultant: Plincke Acoustic consultant: Currie & Brown Principal designer: Currie & Brown Main contractor: Bouygues


orange facade panels contributing to it being a glowing beacon at the heart of the campus.


Public access


As part of integrating the West Hub into the wider site, access for the local community “will be actively encouraged,” say the project team. The two main entrances have been located to provide a pedestrian route through the building that will encourage people to enter and use the facilities such as the cafeteria, and the gardens beyond. Jestico + Whiles says that its ‘biophilic’ design approach “reinforces the building’s link to the landscape.” As a key example, the external rainwater gardens immediately adjacent to the facade are “drawn into the building,” forming two lush internal gardens which are located in “light filled” atria.


WWW.ARCHITECTSDATAFILE.CO.UK


Sustainability & wellness The West Hub is a low-energy building, having been awarded BREEAM ‘Excellent’ thanks to a range of measures including “high performance building fabric” and passive design approaches such as exposing the concrete frame to bring thermal mass benefits. The form has been optimised to ensure that “the natural movement of heat, air and light keep conditions comfortable, while reducing energy demand,” said the architects. Lighting sensors and heat recovery and the ground source heat pump shared with the adjacent Ray Dolby building have helped achieve a 10% reduction in carbon emissions – in accordance with planning requirements to move away from gas as the primary fuel. The building, say the architects, “adopts many aspects of the WELL Standard,” including good quantities of natural light, promoting the use of stairs,


ADF JANUARY 2023


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76