10
NEWS
Photos © Tom Bird COMMERCIAL
FCBStudios completes ‘expressive fl at- iron’ offi ce building in Leeds
Globe Point is the fi rst building to be completed within the CEG Temple Development in Leeds. The FCBStudios masterplan for the 3.52 ha Temple Development “respects its historic context and industrial past while enabling a new sustainable community to grow,” said the architects. Globe Point is a ‘Grade A speculative
offi ce development’, with over 3,500 m² of workspace for over 400 people. Drawing on the heritage of the area, Globe Point takes the form of an “expressive fl atiron building” to maximise the area of a challenging site boundary, and creates a gateway to the wider Temple development. Designed to BREEAM Excellent,
WiredScore Platinum fl oor plates maximise natural daylight to fi ve fl oors of
WWW.ARCHITECTSDATAFILE.CO.UK
fl exible workspace. In collaboration with interior architects Ekho Design, the offi ces have been designed for “wellbeing and sustainability,” and smart technologies are used to “control and drive energy performance,” said FCBStudios. A ground fl oor café kitchen and business lounge offer a convenient meeting space close to Leeds City Station’s southern entrance. “The development is strengthened by the intricacy of its detail,” said the architects, from the brickwork of the stepped window reveals, granite insets, and the curved arch head of the building marking the beginning of the Temple development. FCBStudios added: “The colour and type of brick was carefully considered in relation to the surrounding historic context.” The design of Globe Point “draws on the
restrained composition of the nearby mill buildings but introduces contemporary detailing and construction methods to create a robust yet elegant building that sits comfortably in its surroundings.” The nose – a concave ‘scallop’ element on the apex of the building – is repeated in the crown of the building and again at the entrance, and internally “using different scales to suit the location.” The ‘bird’s mouth’ brick corner detail are mimicked in the metal crown, creating a consistency and uniformity that “ties the building materials together,” said the architects. Designed to deal with the demands of changing workplace strategies, the Globe Point project aims to raise the bar in terms of quality, occupant wellbeing and sustainability.
ADF JANUARY 2023
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76