Pulling together in ROPES JIP
With the increase of ship size and the planning of new terminals along waterways and port
entrances, the effects of passing ships on the motions and the mooring loads of berthed vessels
have become an important issue for planning, engineering and port
operations. ROPES JIP investigates this issue.
Henk van den Boom
h.v.d.boom@
marin.nl
2007
Start ANYSIM: multi-body time domain simulation
The Research on Passing Effect of Ships (ROPES) Joint Industry Project (JIP) is aiming to develop and validate computational tools to predict the loads on berthed vessels so that the motions, line and fender loads can be computed in a reliable way. The project comprises software development and deliv- ery, model testing and extensive full-scale monitoring. A combination of numerical analysis, laboratory experiments and real world data is a powerful mix when it comes to providing a better insight into the effects of passing ships. At the same time, sufficient data will be collected to develop and validate numerical tools for the dynamic analysis of moored vessels.
A monitoring campaign will be conducted in the Port of Rotterdam for various berthing geometries. A moored vessel will be exten- sively instrumented to record motions and mooring loads. In addition, the speed and distance of passing vessels will be recorded as well as the wind, wave and current con- ditions. In this way each situation can be numerically simulated and a deterministic correlation between the numerical results and the measured values can be obtained.
Best Practice Finally, the results will be evaluated and a Best Practice will be developed to provide solutions for existing and new port and terminal developments.
ROPES was initiated by PMH, Svasek, Deltares and MARIN and stakeholders such as ports, terminal operators, vessel operators and engineering contractors are all invited to participate in this three-year project. For further information please contact Mr Jo Pinkster (
jo.pinkster@
pmh-bv.com) or Henk van den Boom (
h.v.d.boom@
marin.nl).
1000 2000
-2000 -1000 0
Case_1 Case_2
0
500
1000
1500 Time (s)
Sway force on moored LNG Carrier in deep (Case_1) or shallow (Case_2) part of terminal. VLCC passing in deep channel
2008
1000 RAPID projects completed
2000
2500
report 21
Force (kN)
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24