search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
COMMERCIAL KITCHENS & FOOD PREPARATION


inflation or repair costs, the lifecycle cost of repeated replacement can exceed the cost of a single heavy-duty installation.


Importantly, the real cost is not the floor itself, but in the shutdown. Every time a production facility closes for floor replacement, the operational loss can far exceed the cost of a new floor. Lost manufacturing time, labour disruption, and product delays often dwarf the material price difference.


CONSIDER HOW THE AREA WILL BE USED


Remember that usage determines system type, thickness, and durability requirements. Is the space, for example, a dry production room, a warehouse, a logistics hub, or a wet washdown area? Whereas a pharmaceutical packaging suite may experience light foot traffic, a finished goods warehouse may operate forklifts seven days a week.


It’s not just what traffic occurs, but how frequently. Constant forklift loading demands a heavier-duty system than occasional pallet movement. Thicker systems, such as FeRFA Types 4 to 8, are designed for medium to very heavy-duty environments, whereas thinner coatings, or Types 1 to 3, suit lighter use.


CONSIDER CHEMICAL EXPOSURE LEVELS


Next, consider the chemicals, including those used for cleaning and sterilising, that the floor may come into contact with, as well as the extent, frequency, and temperature of any spillage.


Food production may involve aggressive cleaning chemicals, and pharmaceutical or chemical plants may use acids or solvents. FeRFA types 1 to 3 are not generally recommended here as the thin layer is susceptible to impact damage, and more likely to suffer thermal shock or struggle to cope with regular washdowns.


Of course, not all chemicals will lead to structural failure, and some will discolour though not damage a floor. The key to maximising the system’s life expectancy is selecting the correct resin chemistry for your facility.


CONSIDER EXTREME TEMPERATURES


Manufacturing facilities often need to contend with extreme temperature variations. Steam cleaning will expose flooring to temperatures of up to 120C, for instance, while blast freezers may operate as low as -40C. Considerations include the type, nature, and duration of exposure.


Some resin systems typically perform well up to around 120C, depending on the chemistry and thickness. Certain chemistries soften at temperatures above 60C, which, when trafficked can cause them to be damaged easily. The right chemistry will ensure your floor performs in a wide variety of temperature variations.


CONSIDER HYGIENE VERSUS SLIP RISK


Where floors are regularly wet, systems must include slip resistance, which is achieved by adding aggregates to create texture in the surface finish.


In the UK, the main method of measuring slip resistance is the pendulum test, in which a rubber slider is swung across a floor surface to simulate heel strike, with the distance it travels translating to a numerical pendulum test value (PTV).


x.com/TContractFloors


The Health and Safety Executive (HSE) mandates a minimum PTV of 36 for commonly wet areas, from food manufacturing washdown areas which are cleaned with chlorinated foams, to manufacturing environments, where oils and grease are commonplace.


However, increased texture can affect cleanability, so the right balance must be struck between safety and hygiene.


CONSIDER THE TYPE AND CONDITION OF THE SUBSTRATE


Resin flooring follows the profile of the substrate, whether that is concrete or screed. If the substrate is pitted or damaged, a screed system may be needed to bring the surface back to level to provide a consistent, durable and suitable surface


IS THERE A DAMP-PROOF MEMBRANE?


Older buildings may lack a functioning damp proof membrane (DPM). Without proper moisture control, certain epoxy systems can blister or fail.


As such, moisture-tolerant systems or a surface-applied DPM may be necessary. Knowing this early on helps avoid expensive remediation later down the line.


WILL PRODUCTION CONTINUE RUNNING DURING INSTALLATION?


In food and pharmaceutical facilities especially, installation must often occur during limited shutdown windows.


Odour control, avoiding taint, dust management and fast curing times can be critical factors. In some cases, a more robust system installed during a planned shutdown is preferable to repeated short closures for repairs.


DOES THE FACILITY HAVE ANY SPECIAL REQUIREMENTS?


Certain environments require additional properties of their resin flooring. Electronics manufacturers or facilities where powders or solvents may be used, for example, may need electrostatic dissipative (ESD) flooring to mitigate the risks. Food production areas may need hygienic, impervious systems, and pharmaceutical operations may require systems that comply with good manufacturing practice (GMP) regulations.


All this should be built into the original specification to ensure the final product meets the facility’s individual needs. And, of course, if a building’s use changes, the floor specification should be reviewed accordingly.


THE BIGGER PICTURE


When correctly specified, resin flooring systems can deliver seamless, hygienic, high-performance surfaces for well over a decade.


The key is early consultation and honest discussions around operational demands, environmental conditions, maintenance expectations, and the true lifecycle cost. Because when viewed through the lens of total cost of ownership, investing in the right system from the outset is almost always the most economical decision.


https://industrial.sherwin-williams.com/emeai/gb/en/resin-flooring.html www.industrial.sherwin-williams.com


23


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42