COVER STORY


purpose smoothing compounds are often the best choice. The ease with which some formulations can be applied helps flooring contractors to work quickly and efficiently.


For example, F. Ball has drawn upon the latest cement formulation technology to create a ‘best-in-class’, high flow smoothing compound: Stopgap 1400.


The two-component smoothing compound has superior self- smoothing properties, is walk-on hard from just 90 minutes after application and ready to receive floorcoverings from 12 hours.


Stopgap 1400 can be applied between 2 - 10mm thick to a wide range of absorbent and non-absorbent primed subfloors, including sand/cement and calcium sulphate (e.g. anhydrite) screeds, concrete, granolithic, sound asphalt, terrazzo, epoxy and polyurethane resins, ceramic and quarry tiles, as well as Stopgap waterproof surface membranes. Furthermore, its low-odour, protein-free formulation allows it to be used in biologically sensitive areas.


INITIAL PREPARATIONS


Before a smoothing compound is applied, always make sure that the subfloor is suitably sound, smooth and dry enough for the receipt of subfloor preparation products and floorcoverings. This should include the removal of any surface contaminants. There are also situations where additional preparations, such as the application of a repair compound, will be required to achieve a perfectly smooth base – where sand/cement screeds are mechanically damaged, for example.


A subfloor moisture test should be undertaken as part of any flooring installation. Where relative humidity (RH) levels within the subfloor are above 75% (65% if installing bonded wood floorcoverings), the application of a waterproof surface membrane will be required to prevent excess subfloor moisture attacking


x.com/TContractFloors 15


adhesives and floorcoverings, potentially leading to floor failure. The application of a primer is also recommended in almost all circumstances prior to installing a smoothing compound.


After these steps have been undertaken, the application of an appropriate smoothing compound is the final stage in the subfloor preparation process before new floorcoverings can be installed.


SUPPORT AVAILABLE


F. Ball’s technical service department is on hand to answer questions about subfloor preparation and floorcovering installation, including the best smoothing compound for a particular situation. They are contactable by phone or WhatsApp on 01538 361633, as well as via a contact form and live chat facility on F. Ball’s website.


https://f-ball.com/en


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42