search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
OPERATIONS MANAGEMENT


Lihir mine is in a remote and cenvironmentally challenging location


are designed to provide a long service life. Lihir Mine has been operational since the mid-1990s, processes up to 15 million tonnes of material per year, and is the fifth largest gold mine in the world. Located in Papua New Guinea – an equatorial country surrounded by ocean – the mine is constantly exposed to humid weather conditions and sea spray, creating an extremely corrosive environment for metals, and an ideal application for stainless steel piping. Te mine relies on the long service lifespan of its piping systems due to the remoteness of the site which can complicate and lengthen maintenance schedules. Te mine’s US$45 million sustaining


MATERIAL DIFFERENCE S


tainless steel piping has a long history on mine sites. Te robust, corrosion-resistant material is ideal for mine process piping systems that


A BETTER WAY TO JOIN STAINLESS STEEL PIPING In comparison with threading, Victaulic Vic-Press for stainless steel piping requires no skilled labour to operate special equipment. Vic-Press joints are pressed into place with an easy-to-operate hand-held gun. Tis ease of installation allowed the


works programme included a project to replace existing corroded pipelines with robust, corrosion-resistant stainless steel piping. Victaulic Vic-Press products for stainless steel piping were chosen to provide a high-quality, ASME-compliant piping system. Te owner’s and engineer’s key concerns were to ensure joint integrity while increasing the life span of the piping systems.


22 www.engineerlive.com


Frederik Tryssesoone discusses stainless steel piping solutions for remote mine sites


piping system to be joined by the local labour force and ensured consistent, properly installed joints throughout the project. Furthermore, Victaulic Vic-Press installed six times faster than threading.


REMOTE SITES ARE NO PROBLEM Victaulic representatives worked closely with the Lihir Mine project team; from the feasibility and product selection stage with the engineer, all the way through the bidding stage with contractors. Te company also coordinated with the mine’s procurement teams for advanced stock forecasts to ensure its materials would be delivered on time. Despite the remote location, the representatives visited the Lihir Mine site to provide hands-on training to the local workforce in Papua New Guinea, providing complete assurance and peace-of-mind to all stakeholders that the system would be installed correctly and meet ASME code requirements.


Corroded piping was replaced with stainless-steel piping at Lihir Mine


Frederik Tryssesoone is with Victaulic. For more information visit www.victaulic.com.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52