search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
SPECIALIST EQUIPMENT


installation without additional borehole sealing. A considerable challenge – and one that not every system has overcome – is how to ensure that the resins are stable and perform uniformly at diff erent temperatures. Pumpable resins can be used with cable bolts, as well as with hollow bolts or self-drilling anchors. Open times can be adjusted to suit the application and the resins can be adjusted to work at a range of temperatures from 5°C upwards.


FASTER CYCLES T e speed at which the use of these new resins is spreading demonstrates how eff ective they are. Following extensive fi eld trials on surface and underground, the MasterRoc RBA 38X series was deployed commercially for the fi rst time in 2019. Today the resin is being used in major mine development projects. In less stable ground, the immediate


benefi ts of the resin system are apparent: installation times for cartridges can take 10 or 15 minutes, whereas a self-drilling bolt combined with pumpable resin takes 2.5 to 3 minutes. Although cycle times in good ground are similar for either


polyester cartridges or pumpable resins, some mines are fi nding that it makes sense to use pumpable resins throughout because there is no need to switch between systems if the rock quality falls. T ere are longer-term benefi ts of using pumpable resin too: it penetrates cracks and fracture zones around the bolt, consolidating the ground and increasing its stability. In fact, the polyurea silicate resins used in the MasterRoc RBA 38X series were developed from those used in rock consolidation. Larger-than-planned borehole diameters do not create potential problems with this system as the resin can be pumped until the hole is completely full.


Given that the cost to refurbish a tunnel is three-to-fi ve times the cost to build it originally, improved rock stability and fewer bolt failures over the life of the facility mean lower lifetime costs for the mine.


ADAPTATIONS Switching to pumpable resins requires new or modifi ed equipment. Rigs with built-in systems for pumpable resin have come onto the market in the past 12


months. For some existing equipment fi eld trials have demonstrated that retrofi t kits work well, at a fraction of the cost of a new machine. As with any new operation, mining


operatives will require advice and training as they start to work with pumpable resins. However, systems such as MasterRoc RBA 38X have been designed to be easy to use, and reports that workers prefer to work with the pumpable resin rather than with the cartridges confi rm this.


As well as being easier to work with, pumpable resin is safer too, because there is no need to approach the rock face to install a cartridge. Everything can be done by the boom of the rig, with the operator positioned behind the boom in the cabin of the machine. In an environment where mine operators are looking for more automation to improve safety, this system off ers another considerable benefi t.


Uwe Wyink is global technical manager at BASF. www.ugc.basf.com


EQUIPMENT


SERVICE


CONSTRUCTION CHEMICALS


ROCK REINFORCEMENT


UNDERGROUND EXPERTISE PROJECT SUCCESS BEGINS AT THE BEGINNING


We are a global brand with access to the brightest minds in our industry. We deploy these experts to the local level where we serve as true collaborative partners for our clients. This partnership allows us to fill knowledge gaps, maximize efficiencies, and assume full responsibility to offer our clients the greatest return possible.


EQUIPMENT SERVICE CONSTRUCTION CHEMICALS NOR_180319_International Mining Engineer - May 2018_w185xh121.indd 1 ROCK REINFORCEMENT NORMET.COM 19.3.2018 18:24:06 www.engineerlive.com 41


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56