search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
74 SAFETY & SECURITY


‘Just enough’ is no longer enough


uncomfortable – if not chilling – reading for most in the building industry. Architects, specifiers and contractors who opt for more cost-effective solutions but don’t fully understand the rules or implications, manufacturers who ‘manipulate’ official testing and market products that aren’t fit for purpose. It’s construction as it is rather than as it should be. We saw it in the Lakanal House fire in 2009 and we’re seeing it again now. It is now apparent the wrong cladding


T


was put on the building for thermal and appearance improvements. It was also fitted incorrectly, which resulted in accelerating the fire. But it’s not just the cladding at fault – an


endless list of errors has been uncovered. There was only one staircase (and so one escape route) rather than two, which would have allowed fire fighters unimpeded access to do their job while tenants got out. There


he Grenfell Tower tragedy is once again making headlines. The latest news from the enquiry makes for


was no complete sprinkler system. Annual inspections weren’t carried out to check the integrity of the building. The main gas supply wasn’t turned off until hours after the fire started. It was a particularly hot day and many windows (and perhaps doors too) were open, encouraging the spread of fire rather than compartmentalising it.


The debate about value engineering versus ‘over-engineering’ In an ideal world - where everything performs as we’d like it to - we can rely on 30 minutes to get in and out of a burning building safely. We can rely on ‘value engineering’ products and systems to ‘just’ meet requirements and work together effectively. But in the real world, small product variations and the myriad of variations in how a building is built or maintained add up and eat into our safe time. The sum of small individual product (and human) variations can turn a safe outcome with a comfortable margin into a near-miss or catastrophe.


We need to seriously rethink our attitudes


to value-engineering and over-engineering. We need to know that the buildings we live in, visit and use every day have a comfortable fire safety factor built in. At Enfield, for example, we deliberately


‘over engineer’ our Fire Doors so they have extra safety time built-in to every door. In tests sponsored by MHCLG, Enfield’s doors passed with a reassuringly large margin: ‘opening in’ exceeded the time by 19 per cent and ‘opening out’ by an exceptional 70 per cent (51 minutes). Watch the fire doors being tested at www.enfielddoors.co.uk. Of course, fire isn’t all you need to consider


when specifying doors. Our PAS 24 enhanced security door sets, for example, are available with 30 and 60 minute fire resistance, 33dB acoustic reduction and a choice of quality ironmongery and finishes that all meet or exceed requirements. For the architects, specifiers and contractors we deal with - as well as their clients and building users– noise is also important, particularly for offices and flats. Anti-bacterial finishes (hygiene coatings or high-pressure laminates incorporating silver ions) were increasingly being specified on doors in high traffic areas to help prevent the spread of disease, even before the Covid-19 pandemic. Eco-credentials and sustainability are high priorities. And security remains a crucial consideration for internal entrance doors. The same principle stands: whether a


product has one or multiple standards or requirements to meet, it should do so with a comfortable margin. ‘Just enough’ just isn’t enough. If events over the past few years initiates a


lasting change in our thinking as a nation, we’d all sleep a lot safer.


020 8805 6662 www.enfielddoors.co.uk


WWW.ARCHITECTSDATAFILE.CO.UK


ADF DECEMBER 2020


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84