search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
44 EXTERNAL ENVELOPE


Centre Square Buildings One & Two make a bold impression with ALUCOBOND®


panels


transformative project of civic space combining old and new with a mix of buildings designed to bring a renewed vibrancy to the city. When complete, Centre Square will offer


C


leisure, residential, commercial and retail opportunities as well as arts and numerous green spaces. To fulfil the area’s business aspirations, ultimately five office building are planned with the Ashall Property owned buildings One Centre Square due for completion August 2019 & Two Centre Square, completed July 2019. Both One & Two Centre Square were the


creation of Seymour Architects; One Centre Square being a four-storey office building with a net internal area (NIA) of 60,000 ft2 and Two Centre Square a three-storey office building with an NIA of 30,000 ft2


. For both


constructions the brief was to design modern, impactful structures. One Centre Square, for example, has an external white brick frame, which extends from ground to the third-floor level. A number of elements are arranged asymmetrically within each structural bay to provide visual interest; the elements include curtain wall, angled brickwork and iridescent cladding. A fully glazed penthouse storey sits above and is set back from the brickwork frame. Two Centre Square adopts the same strong white brick frame, with curtain wall infill, forming the base or plinth that the two upper floors rest upon. Curtain walling extends from first floor to the roof parapet and the building is provided with its character by fins that extend from the curtain wall mullions. The spacing and frequency of the fins increases with height and are formed in a cladding material that embodies two iridescent colour pigments, so that as the material is viewed from


entre Square is the collective title for the ‘heart of Middlesbrough’ development, a stunning and


different angles, it changes colour. Both the plinth and the finned curtain walling form an uninterrupted wrap enveloping the whole building. With vitality, vibrancy and regeneration the


key motivators behind the projects, the buildings required a facade and finish to match, which is why ALUCOBOND®


A2 was


chosen for the cladding on both buildings finished in the company’s ‘Dessert Gold’ for One Centre Square and ‘Amazon’ for Two Centre Square. Both finishes work in unison with the facade to stunning effect. Fabricated by CA Group and installed


by Topside Group, approximately 3,000 m2 of ALUCOBOND®


A2 was used chosen


for its non-combustible properties, whilst facilitating the most envelope expanding architectural demands its mineral-filled core meeting the strict requirements of the fire regulations globally and finding Application on a wide range of project types. Both buildings are Grade A BREEAM, which means they meet the


very highest standards for energy efficiency and sustainability. And both buildings have received critical


acclaim from both the local community and business sector.


Paul Herbert, Sales Manager: 07584 680262 Richard Clough, Business Development Manager: 07760 884369 www.alucobond.com


PROJECT DATA


Project: One Centre Square & Two Centre Square Location: Middlesbrough Facade material: ALUCOBOND® A2 spectra Desert Gold + Amazon Construction system: Tray panels screwed Buildung Owner: Ashall Property Architects: Seymour Architecture Fabricator/Installer: CA Group/Topside Modular Engineering Year of construction: 2019 Copyright pictures: Ashall Projects (MB) Ltd


WWW.ARCHITECTSDATAFILE.CO.UK


ADF DECEMBER 2020


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84