30 PROJECT REPORT: MIXED USE SCHEMES


bricks. In addition there was the challenge of conserving the wall as best as they could while minimising the cost of the process for the developer.


Energy use


Another challenge in the implementation of the project’s design was integrating services, given the highly constrained nature of the site. Tom explains: “Placing the services was difficult – pushing the rainwater tanks back without doing much deep excavation (specified in the planning process) meant that we didn’t have space for a transformer, and we had to go back and forwards a few times to ensure that we wouldn’t need one.” The architect says the team’s design was right on the threshold of regulations in terms of requiring a transformer, and as such had to retrospectively design an energy strategy to stay within the parameters. Where the original scheme utilised ground source heat pumps, the architects instead had to substitute a system with a lower electrical demand, which ended up being a communal gas air absorption heat pump. Despite this perhaps slightly less ecological specification, the team hit Code Level 4 for the homes, and received a high BREEAM score of Very Good for the commercial units. The latter however was not final, as the team only constructed an “insulated shell,” and this necessarily changed during fit out.


Enabling them to reach this target were various sustainable methods, including high U-values in the walls, high levels of airtightness with insulation tape and seals to the windows, and low water usage fittings in the bathrooms and kitchens.


Success Looking back, the architects both view the project as a “huge success,” especially in the face of its many challenges.


Simon tells me the conserved wall on the park’s side caused further issues throughout the project. There was a lot of planting, weeds and trees that had seeded between the wall and the two skins, so the team had to peel this away to expose what was left, as well as remove damaged bricks, and replace it with lime mortar and reclaimed


WWW.ARCHITECTSDATAFILE.CO.UK


“It boiled every inner city complexity into one,” says Tom. “Party wall awards, site access, ecclesiastical exemptions, conservation, drainage, contaminated soil… the list goes on.” According to Tom and Simon, however, it was all worth it, and the client was reportedly very pleased with the results. “The fact is that their units have sold, so they were obviously happy, but even far before that, the planners and the potential residents were hugely supportive of the scheme and the spaces we wanted to create,” says Tom.


“It definitely stretched us,” Simon adds, “but the result says it all.” 


ADF DECEMBER 2020


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84