Technical Article Metric Chlorine Cost ($/lb.)
Chlorine Usage (per lb. of Al) Chlorine $/day
Ave Cycle Time (mins) Ave Total Cycles/Day Ave Repeat Cycles
Ave Approved Melts/Day Success rate
Total Degas Time (mins per day) Melt (lbs./day)
Tibor% Melt/lbs. per lb Al COVERAL MTS 1582 Grain Refining Cost/Day Argon Spend/Melt
Incumbent $3.20
0.15% $28.80 30 8 2 6
75% 338
6000 .25% 0
$104.55 $11.05
Table 5: Tabularized Dataset of Incumbent and New Procedure Continued from pg 29
• Not a single failed specific gravity test since implementation! 25% of the treatments with the incumbent process would fail specific gravity testing allowing for 2 more melts treated and poured per day.
• A 69% reduction in degassing time average per day
• 30% increase in metal poured per day
• Effective elimination of hexachloroethane pills (without performance implications) leading to improved safety and environment
Saving Argon
Chlorine Pills Grain Refining Baffle Plate
Graphite Shafts/rotors Sum annualized savings Payback (yrs)
Payback (months) Table 6: Payback Calculation Table Payback Calculation Component Savings
$8,462.38 $7,488.00 $21,949.20 -$1,500.00 -$1,459.90 $34,939.68 1.37
16.50 MTS Process
0 0 0
13 8 0 8
100% 104
7800 0
0.06% $20.13 $6.40
Comments
N/A N/A
100% reduction 56.67% reduction N/A N/A N/A N/A
69.2% reduction in degassing time 30.00% increase metal poured per day N/A N/A
$84.42 or 80.7% reduction in daily spend
30 ❘ May 2020 ®
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36