BUILDING FABRIC 19 Latest Wembley success for the Schöck Isokorb


comprises 10-storey and 15-storey, blocks providing 340 new residential apartments with cafes and restaurants planned at ground level. The slide-on balconies are a striking feature, but critical to their structural and long–term insulation performance is the incorporation of Schöck Isokorb structural break units. Early involvement was necessary to ensure that the connectors were accurately cast into the building during the mainframe construction phase. A stub bracket was attached to the Isokorb units and the balcony cantilever support arm attached. The fully pre-assembled balcony chassis was then slid on to the cantilever arm and locked in position.


T


THERMAL BRIDGING IS A CRITICAL ISSUE If there is ineffective insulation at the connection points, there will be local heat loss, resulting in more energy being required to maintain the internal temperature of the building. This is a major consequence of thermal bridging, but there are other issues. Low internal surface temperatures around the thermal bridge can cause condensation, leading


not only to structural integrity problems with absorbent materials, but also mould growth. This can have serious health implications for residents in the form of asthma and allergies. As the leading international supplier of


structural thermal breaks, Schöck has almost limitless variants available in its main Isokorb range, offering planners complete construction dependability and enormous freedom of design. All products meet full compliance with


Longfloor have launched game-changer


Longfloor has launched a game- changing development for the construction industry, a revolutionary approach in the way liquid cement screeds are applied, a global first


which will fundamentally enhance the way liquid cement screeds are used.


Darren Williams, Longfloor General Manager said: “The screed industry has witnessed a sea change in favour of cement-based liquid screeds but for many years has attempted to develop one which flows well, dries quickly and is as easy to install as possible. We are very excited to announce an industry first. The future is grey!”


01629 540 284 www.longfloor.co.uk


Sapphire glides to success on balcony project Sapphire’s Glide-On


TM Cassette® balcony system has risen


to the logistical and timescale challenges posed by Kennet House, an office-to-residential refurbishment by Crest Nicholson on the river Kennet in Reading. Surrounded by the river on two sides, the building’s location was a major challenge. Also, because the project was a refurbishment of an office building, anchors needed to be fixed to the existing slab, rather than cast-in. This


meant ensuring balcony rigidity while the slab strength was uncertain. Post-fixed brackets were chosen to connect Sapphire’s innovative 1-piece arms to the existing slab. These allowed the Glide-OnTM Cassette® to be installed quickly and easily, while keeping deflection to a minimum.


www.sapphire.eu.com WWW.HBDONLINE.CO.UK NEC 9th - 12th July


Stand D131


Modern Garage Doors, For Modern Homes


Visit www.garador.co.uk to view the full range


CALL


01935 443794 TO REQUEST A BROCHURE


the relevant UK building regulations; have NHBC approval; offer LABC Registration and independent BBA Certification. For a free copy of the Schöck Thermal


Bridging Guide; the Schöck Specifiers Guide or to view the range of downloadable software, contact Schöck on…


01865 290 890 www.schoeck.co.uk


he massive Wembley Park regeneration project continues apace. And one of the latest completions is The Alameda. It


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52