search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
CASE STUDY - MODULAR HOUSING 17


Protect Membranes is supplier of choice for flagship modular development


W


all construction membranes, roofing underlays and accessories from Protect Membranes have been


used by modular construction specialists Totally Modular as part of an innovative pilot scheme, built offsite on behalf of social housing provider Citizen in partnership with Coventry City Council. Built in compliance with BOPAS, CML and LA Building Control requirements, the scheme involved the manufacture of a two-bedroom and a three-bedroom two-storey dwelling in light gauge steel frame, built in controlled factory conditions in Totally Modular’s premises.


Four fully furnished modules were created, delivered to former disused land in Willenhall and craned into place before being connected together onsite. Taking just twenty weeks from build to delivery, time on site was reduced significantly in comparison to traditional housebuilding construction. The pilot was deemed to be successful with the potential for roll out across Citizen’s housing stock where suitable land is available. A number of Protect products were supplied and installed in both dwellings to help ensure the management of moisture. This ensured condensation control and strict airtightness levels were met to help meet a minimum level of 4.00m³/h.m.² or lower. This included Protect BarriAir, an internal airtightness and vapour control layer to contribute to energy efficiency and Protect Zytec, a roofing underlay offering strong wind uplift resistance and good vapour permeability. The roof structure also included Protect RediRoll, a universal dry fixed ventilated ridge and hip system and the Protect Eaves Skirt and dry verge system. Mick Pettitt, Director at Totally Modular


The modular homes took just twenty weeks from build to delivery.


commented, “Protect’s comprehensive package of solutions was the perfect fit for this project


Interior of a module, with Protect BarriAir wall construction membrane used to achieve airtightness and vapour control.


to help us meet the detailed specification, using materials that we know are tried and trusted. In particular, the use of BarriAir helped to achieve strict airtightness and vapour control, contributing to an outstanding energy efficiency rating for both properties that exceeded Building Regulation requirements. Protect understood our needs and provided detailed technical support along the way, whilst ensuring our products were delivered on time to meet our busy schedule.”


info@protectmembranes.com www.protectmembranes.com


WWW.HBDONLINE.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52