98 LANDSCAPING & EXTERNAL WORKS
Green-tech adds a touch of green to Edinburgh’s McEwan Hall
Edinburgh’s old town. Officially opened in 1983, and bordered by
B
the famous McEwan Hall, Reid Concert Hall and the Teviot Building; Bristo Square soon established itself as a communal place where all aspects of Edinburgh society could meet, making it amongst other things, an epicentre for the Edinburgh street skating scene. In 2015 a £33m redevelopment project
was undertaken to include a major refurbishment and expansion of McEwan Hall and to the front of Bristo Square, with the external works and landscaping to make it more accessible and safer, designed by Landscape Architects Ironside Farrar Ltd. In 2017 a completely new outdoor festival
arena was unveiled, in keeping with Edinburgh’s reputation as a festival city. Bristo Square is now a customary location for sections of the Edinburgh International Fringe Festival. As part of the design, artist Susan Collis was commissioned to create a meandering sculpture of bronze drips running 68m across the square. Works in Bristo Square included tree planting, creation of more social spaces and improved accessibility. It was designed to give a light, open space, with tiered seating steps around the central events area. Bordering this paved pedestrian area are ten semi-mature trees set in hard landscaping. These trees help to soften the cityscape and provide much needed shade during the summer months. In order to protect the tree pit soil from compaction, Landscape Architect Ironside Farrar specified Green-tech’s ArborRaft tree planting system which is widely used across the country in urban tree planting projects. The ArborRaft System combines nutrient-rich ArborRaft soil with exceptionally strong geocellular units. Together they create a healthy growing space for trees in areas subject to vehicle loadings and trafficking. Individual ArborRaft units are locked together to form a raft system that sits within the tree pit. The system works by spreading the load of any vehicle movements around the tree’s rooting area which eliminates soil compaction within the pit and helps to create the ideal growing environment for the trees to establish and mature.
risto Square sits on part of the estate of The University of Edinburgh, nestled against the southerly edge of
is then placed over the sleepers and kerbstones to provide added weight and security for the tree. This is a well tried and tested system that has been incorporated into many rail, utilities and urban projects throughout the UK. gt RootBarrier was supplied to control and
protect the tree roots, as well as protecting structures from the root system. This helps the tree to establish quickly and keep it healthy, especially in the first five years of life. Lack of water at the tree's root ball can be detrimental to the lifespan and survival of the tree so the Green-tech Mona Relief irrigation system was supplied. Installed with a perforated pipe that surrounds the tree's root ball, the Mona Relief system delivers water straight to the tree roots at a consistent level. Each tree pit was given a contemporary
finish with the inclusion of Green-tech’s Fortress tree grilles installed into the surrounding paved surface. These heavy-duty urban grilles enable paving to be laid almost up to the tree trunk, protecting the tree roots, whilst at the same time, allowing rainwater to percolate through. The Mona irrigation pipes are finished off with the aluminium Piazza filler cap, to match the Fortress grilles.
The Outcome A couple of years’ on and the latest visit to McEwan Hall showed that the tree pits are doing their job well, and the trees are thriving. Ian Dooner – Ironside Farrar, Associate
In conjunction with Landscaping and Forestry Contractors M W Groundworks, Green-tech supplied over 200 tonnes of Green-tree ArborRaft topsoil and subsoil. Both of these manufactured soils meet British Standards and are regularly tested to ensure quality of composition and consistency across deliveries. Green-tech also supplied the gt Sleeper and
Kerbstone tree anchoring systems, along with gt RootBarrier and Mona Relief tree irrigation pipes. The gtSleeper and Kerbstone Anchoring
system utilises heavy objects such as sleepers and kerbstones to weigh down the tree and act as anchor points. Well compacted subsoil
Project Manager commented, “It is always good to work on a project that seamlessly links historic buildings to the client’s needs of today. The ArborRaft tree planting system from Green-tech does the job perfectly, allowing more rooting volume for the tree; and we were very pleased how the Fortress grilles blended in with the surrounding paving.” Mark Browne – Green-tech, Key Account Manager added, “This was a great project demonstrating the perfect tree pits. From the Green-tree ArboRaft soil, giving the trees the best chance of establishment, strong geocellular ArborRaft units, Mona irrigation, anchors and grilles; all coming together to form one simple yet stylish solution.”
01423 332100
www.green-tech.co.uk
WWW.ARCHITECTSDATAFILE.CO.UK
ADF MARCH 2020
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100