80 INSULATION; HEATING, VENTILATION & SERVICES
when extending into the building envelope. The Z-girt system we created, for example, is designed to improve a wall assembly’s efficiency by as much as 98 per cent. Thermal breaks are an essential part of creating more efficient structures. More often then not, they’re overlooked; meaning that any other methods of making a building efficient, such as cladding, can be made redundant as the fixtures used to attach the cladding can cause thermal bridges.
Using a thermal break can cut down energy loss by up to 80 per cent for commercial properties, making massive savings on the running costs of these buildings. Now we are in 2020, emissions will need to have dropped 34 per cent since 1990 to ensure the industry is on track to meet the 2050 regulation. So, how can buildings continue evolving to be more efficient? It’s essential that thermal breaks are used within these new builds and renovation projects. The most advanced methods of energy saving can be made completely redundant if the fixings and fastenings, concrete columns, steel framework and building envelope aren’t
Additional commercial space and value
Kingspan Insulation has launched a free online calculator and App to make it easier than ever to estimate the additional space and value you can add to a commercial property by using Kingspan’s thinner, more thermally
efficient wall insulation solutions. The RVoS calculator can be downloaded from the Google Play and Apple App stores or accessed at
realvalueofspace.co.uk. Users can choose from five common external wall constructions, each comparing Kingspan Kooltherm solutions with lower performing alternatives.
01544 387 384
kingspaninsulation.co.uk/realvalueofspace
With the potential to improve efficiencies by up to 80 per cent, architects simply can’t afford to ignore these solutions
properly isolated and protected from thermal bridges. With the potential to improve efficiencies by up to 80 per cent, architects simply can’t afford to ignore these solutions.
As architects continue to work with developers to create sustainable, energy efficient buildings, understanding the latest technologies available on the market has never been more important. A detail that is commonly overlooked – a simple yet effective thermal break – can save hundreds of thousands on the overall energy costs of a building, making thermal solutions one of the most important elements an architect can invest in when working on major construction projects.
Tom Bovan is project engineer at Armatherm
AET Flexible Space secures contract
AET Flexible Space, the British-based underfloor air conditioning pioneer, has won the contract to supply its innovative underfloor air conditioning system to the £60 million renovation of landmark London building,
Citygate House. Architects Stiff and Trevillion are leading the extensive refurbishment of the building, which is due for completion in Winter 2020. All nine floors of Citygate House will be supplied by AET’s system, which makes use of the space beneath a raised-access floor to create the air ventilation path.
01342 310 400
www.flexiblespace.com
ADF IS INDEPENDENTLY VERIFIED BY ABC
WWW.ARCHITECTSDATAFILE.CO.UK
ADF MARCH 2020
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100