CASE STUDY


The bridge on the River Witham


Jack Tighe sub-contracted the scaffold and encapsulation aspects of the work to two existing members of their approved supply chain, SGS Scaffolding and Envirowrap respectively, with a manned safety boat supplied by Kier for all scaffold erection and dismantling works. During the project, the bridge was closed to all traffic, but remained open to pedestrians and cyclists. Phase one of the project involved blasting and painting half of the underside of


the bridge and all of the parapets, this allowed the road to be re-opened and available for civils works at an earlier stage, phase two was to complete the remainder of the underside of the bridge. Heavy rainfall in mid-June caused the River Witham to rise to an unsafe level for


work to continue and the flood risk in place delayed work by four days. Consequently, the Jack Tighe team worked closely with Kier and all other parties to work additional shifts and catch up on lost time. Steve Rudkin, Kier Programme Manager said, "I would like to thank all those


involved in planning, delivering and managing the works, despite the weather doing its bit to disrupt things, we substantially completed all key tasks and met the original completion date. The organisation and co-operation between all parties has been first class and it has been a pleasure to work with the teams concerned. Bardney bridge has been given a new lease of life and feedback from locals on the way site personnel conducted themselves and carried out the work has been very positive."


I


n April 2019, PDA Member firm Jack Tighe Ltd were awarded the contract to scaffold, encapsulate, clean, blast


and paint the structural steelwork at Bardney Bridge. Bardney is a busy village in the middle of Lincolnshire on the east bank of the River Witham.


Jack Tighe Ltd are Members of the PDA based in Lincolnshire but operating Nationwide. You can get in touch with them on 01652 640003 or visit their website at www.jacktighe.com


40


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48