OVERHEAD CRANE MAINTENANCE ZONES Safely Maintain Cranes without Sacrificing Productivity


BY:PETE KIRST, MARKET DEVELOPMENT MANAGER, OVERHEAD CRANES, CONDUCTIX-WAMPFLER AMERICAS


R


outine overhead crane maintenance and repairs are critical for the long-term safety of personnel and longevity of the equipment. However, operators that run multiple cranes on a single runway must be able to shut down one crane while keeping the others running. Fortunately,


this situation can be solved by creating one or more “maintenance zones” on the crane runway system.


WHAT IS A CRANE MAINTENANCE ZONE? A crane maintenance zone is a designated area on the conductor bar runway that is powered down while the rest of the runway remains energized. However, isolating an area of a conductor bar is not as straightforward as it seems. Te setup requires a special series of conductor bar components and a properly wired switching system that will keep the maintenance zone from being accidentally energized by the other cranes still in operation.


A properly installed and wired maintenance zone will:


• Disconnect power in the zone while leaving the main part of the runway energized


• Keep the power off, even if an adjacent crane tries to move into the maintenance zone


• Have a properly grounded maintenance zone that will prevent the crane from becoming energized, and people from being electrocuted


Te solution is to add an electrically-isolated “buffer zone” before the maintenance zone. A typical right-end maintenance zone has a buffer zone in the middle, and the main line power zone on the other side. Additionally, one or more maintenance zones can be established at any point on the conductor bar runway, and buffer zones are then established on either side of the middle maintenance zone.


Air Gap Cross Section 30 SUMMER 2018 INDUSTRIAL LIFTING EXCHANGE


FIGURE 1. End Maintenance Zones – On the right side


HOW DO YOU INSTALL A MAINTENANCE ZONE?


Te first step to install a maintenance zone like the one shown above is to add a “power interrupting section (PIS)” into each of the three phase legs of the conductor bar runway’s right end. A PIS consists of three special conductor bar segments each with a center power feed point (shown in black below). Two 1/2” air gaps electrically isolate the middle section


Center Power Feeds


FIGURE 2. Power Interrupting Section


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36