Kemper System delivers roof refurbishment to Art Deco Gem


Lancashire, required urgent repair. The building was experiencing standing water on a largely zero falls roof with only four drainage outlets, meaning water had started to leak into the occupied offices below. Kemper System’s Stratex Warm Roof system using its Kemperol V210 was specified


T


he roof of an occupied 1930s art deco municipal office building, situated in the busy town centre of Blackpool,


for the 1,200m2 roof area – offering


exceptional performance and supplied as a complete integrated system of matched components. The roof was extremely complex with


detailing around air-conditioning units, raised steelwork and cable trays in close proximity. Contractors also removed and replaced eight rooflights and boxed-in others that were no longer required. All existing steel work on the roof was treated and encapsulated with plywood and waterproofed with Kemperol to ensure additional life span. The cold-applied Kemperol V210 liquid


resin saturates a non-woven reinforcement fleece that is tailored to the exact contours and details of the roof. The waterproofing is installed in a single process and cures to provide a robust waterproof membrane that cannot delaminate and is UV stable. Mark Atherton, managing director at


Castle Contractors, said: “There were three main challenges to overcome on this project


– the safe removal of the existing ballast, cleaning of the roof prior to application, and the creation of drainage channels to carry water to the outlets.” The project was shortlisted for the Liquid Roofing and Waterproofing Awards due to the complexity of the roof which made this an ideal project for a liquid applied membrane, the technical solution offered, and the difficulties experienced with site preparation and logistics.


01925 445532 www.kempersystem.co.uk


ADF JULY 2018


WWW.ARCHITECTSDATAFILE.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84