of the components before the reaction is typically larger than the volume of the end product.


AUTOGENOUS SHRINKAGE Autogenous shrinkage can occur in wet conditions in contradiction to drying shrinkage, which occurs only in dry conditions. This can result in debonding of the grout from the steel in grouted connections and consequently poor load transfer of the dynamic loads that act on the foundations in offshore wind turbine installations. The autogenous shrinkage of MasterFlow 9800 was measured by using the Schleibinger shrinkage drain method; the results are shown.


GROUTING


bulk-supplied grout to achieve the Type Approval Certificate to DNV-OS-C502 for concrete offshore structures.


also upgraded and improved its Recirculating Jet Mixer (RJM) technology from the experience of using MasterFlow 9800. The delivery rates when using MasterFlow 9800 with an RJM are upwards of 20m³/hr and therefore faster grouting of the annulus can be achieved, saving valuable offshore operating days.


SPECIFICATIONS AND CERTIFICATION MasterFlow 9800 gives an improved level of job site safety; unlike a big-bag solution, there is no requirement for craneage and the movement of big bags at head height. On the Beatrice OWF project, this has saved in the region of 7,500 crane movements, reducing risk.


MasterFlow 9800 was developed to allow fast and secure installation and this is achieved by better early strength development reducing the risk of early-age cycling. According to the DNV guideline DNV-OS-J101, only a limited relative movement between the grouted steel members is allowed during the initial curing of the grout and during the grout hardening period to ensure a proper load transfer between the different steel members of the foundation. The strength development of MasterFlow 9800 at early ages was tested at varying temperatures from 2°C to 20°C as shown in Figure 3 below.


BULK DELIVERY CONCEPT The unique bulk delivery concept of MasterFlow 9800 allows for improved secure delivery and will not require expensive dockside storage warehousing. As part of the product development and to meet the requirement of the DNV TAC certification, a system has been developed to give complete traceability of the grout from manufacturing plant to grouted connection.


In conjunction with the development of the product, FoundOcean


The combination of bulk delivery of the product and FoundOcean’s Recirculating Jet Mixer (RJM) technology allows the possibility of transfusing and the mixing of the grout from the manufacturing plant to the grouted connection in a closed system, reducing the risk of dust contamination and waste.


MasterFlow 9800 has been third-party validated to meet the requirements of German BSH approval – Z.i.E. process. In 2016, the product became the only


PRODUCE PLACEMENT Only four months after its introduction in 2015 it was chosen by Van Oord for the installation of the 150 foundations at the Gemini Offshore Windfarm by FoundOcean using its specialised grouting equipment. In 2016, Jun de Nul chose MasterFlow 9800 for the 50


foundations at the Noblewind Offshore Windfarm.


In 2017, Seaway Heavy Lifting has contracted FoundOcean for the grouting of the 84 wind turbine jacket foundations and two offshore transmission module (OTM) jackets at the Beatrice offshore windfarm, for which the bulk-supplied grout was chosen by the client. As the product meets the design criteria for the grouted connection, its proven track record and third-party validation (Type Approval Certificate to DNV-OS-C502) giving improved levels of operational safety and cost reduction.


DEVELOPMENT


The development of MasterFlow 9800 demonstrates BASF‘s continuing commitment to develop revolutionary materials and installation methods to meet their customers’ requirements and contribute towards cost reduction of offshore wind energy.


Charles Elins European Offshore Key Account Manager BASF Plc


WEBSITE www.windenergynetwork.co.uk 13


SCAN/CLICK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95