Carving out such a huge amount of concrete from the heart of the building was a tough construction challenge, made trickier by the fact the concrete cylinders were just 180 mm-thick with limited structural strength.
A new 250 mm sleeve of structural concrete had to be cast inside each of the tubes to boost integrity before they were cut into with jack hammers and circular saws. “The labyrinth of 5.5 metre-diameter tubes, only connected together via openings at the bottom, was a very tough space for the builders to work in,” says Martinovsky.
The method of construction made it difficult for the designers to see progress on site, as the final form was only revealed section by section, like a stone sculpture slowly chiselled away by an artist. “The big reveal only came when a large portion of the atrium was cut out and we realised, thank god, this was actually working,” he adds.
ADF OCTOBER 2017
Beyond the atrium space, interventions were made into the sides of other tubes to create space for footbridges that provide access to galleries. A different approach was taken to create the galleries themselves, the museum’s director had specific vision for white rooms with no architectural detail to distract visitors from the art. As a result, around two thirds of the existing silo tubes were removed, on either side of the atrium, to create space for a series of minimal white cubes that slot into the voids. As visitors walk through the building the cubes can be seen hovering above the ground floor, and they can be viewed from below and from the side.
Glittering pillows
The Silo Building is like an architectural pandora’s box, its flamboyant sculptural interior concealed behind a largely unadorned concrete facade.
A light-touch approach to the exterior
WWW.ARCHITECTSDATAFILE.CO.UK
PROJECT FACTFILE
Client: Victoria & Alfred Waterfront Holdings (Pty) Location: Cape Town Completion date: September 2017 Total area: 102,000 ft2 Exhibition space: 65,000 ft2 Designer: Heatherwick Studio Project manager: Mace Structural engineer: Arup / Sutherland
M&E / sustainability engineer: Arup / Solution Station
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100