JACK-UP VESSELS
FEATURE SPONSOR
SINGLE CONTRACT BESPOKE SOLUTIONS
Fred. Olsen Windcarrier offers wide ranging, flexible and bespoke solutions through a single contract.
As well as having two supreme and flexible jack-up installation vessels in Brave Tern and Bold Tern, the company provides specialist engineering and project management expertise, around 600 of the industry’s most experienced technicians through related company Global Wind Service, a fleet of high performance service vessels and a reputation for getting the job done safely, efficiently and reliably.
HISTORY
Built on 169 years of offshore and marine experience, Fred. Olsen Windcarrier was established in 2008 and took delivery of the two self-propelled jack-up vessels 4 years ago. Both Tern vessels underwent upgrades during 2016. The upgrades included extending the jacking legs by 14m, making the legs 92.4m long. The cranes were prepared for a boom extension
of up to 20m. This included both an insert piece for the crane boom and an extension of the A-frame. The lifting height is now 120m from the main deck.
BLOCK ISLAND OFFSHORE WINDFARM
One of the top highlights to date has been the installation on the Block Island Offshore Windfarm – the first offshore windfarm to ever be installed in U.S. waters. The company’s scope of work included the transportation of 5 GE nacelles across the Atlantic and installation of the complete Haliade 150- 6MW turbines at Block Island. They worked closely with American companies to deliver the project, in particular with U.S. flagged feeder barges for the transportation of towers and blades from shore. The project was safely completed in just over 70 days, ahead of schedule.
FAST TRACK PROJECTS
Fred. Olsen Windcarrier has also undertaken several short o&m fast track projects across numerous locations in Germany and the UK, with project assignment to execution within a short timeframe. These projects were carried out smoothly and efficiently. During the Global Tech I project,
Fred. Olsen Windcarrier made a record performance in the transportation and installation of 8 turbines in 1 week, including 10 hours transfer time each way to the windfarm. The flexibility of the vessels was key to achieving this operational target.
Fred. Olsen Windcarrier
66
www.windenergynetwork.co.uk
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68