CABLE PROTECTION


towers. The cable protection system installation process can be tested prior to installation at CWind’s demonstration site in Barrow to help ensure seamless delivery out in the field. The shore based Transition Piece can be configured to accept various systems to ensure full functionality and engagement along with the correct tower pull-in techniques and methodology. The effectiveness of these systems have been proven with over 400 cable pull-ins successfully completed at seven offshore windfarms to date including Gode Wind and Gwynt y Môr.


WEALTH OF EXPERIENCE


Installing, protecting and maintaining cable on the seabed has been Global Marine’s business for over 165 years.The company’s wealth of experience has been gained through successful installations and maintenance worldwide across all possible seabed conditions, terrains and ocean currents.


RECORD BREAKER


When installing the Pulau-Ketam power cable in Malaysia, Global Marine buried the cable to a record-breaking depth of 13.8m below the seabed, and during the installation of the Svalbard system inside the Arctic Circle, the company delivered the world’s deepest water ploughing at 1,700m; both requiring precise execution, the right tools for the job and a commitment to ensuring the cable’s longevity.


Global Marine Systems


of established windfarms are located. Proper planning and initial route engineering, based on in-depth survey data, is the first line of defence to ensure that the cable route is carefully selected to avoid hazards, difficult terrain and busy shipping routes to name a few.


Route clearance can mitigate risk from unexploded ordnances and techniques such as cable armouring and mattressing can minimise damage caused by abrasion or entanglement. It is only through adequate burial that cable can be placed out of reach of such interaction, however.


ADDITIONAL SERVICES


In addition to delivering the services mentioned above, Global Marine, in conjunction with its affiliate, CWind, also works to effectively manage the cable pull-in process ahead of cable lay and burial to safely and effectively secure the connection between


www.windenergynetwork.co.uk


31


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68