COST OPTIMISATION


FEATURE SPONSOR


UNCHARTED WATERS – PROTECTING ASSETS POST-WARRANTY


With the UK offshore wind industry maturing, the challenges presented by Windfarm operation & maintenance (O&M) are rising. The UK offshore wind O&M services market is expected to grow to almost £2 billion by 2025 and by 2020 there will be up to 4,000 wind turbines and 50 offshore substations requiring O&M. This brings technical, commercial and safety risks, particularly as windfarms come out of standard warranty periods. The industry’s priorities for offshore wind O&M development should include improvements in asset management strategies through addressing these barriers.


IN THE CONTRACT


The range of contractual and technical arrangements for wind sector O&M is wide-ranging and complex. A key challenge for many owners, looking to operate and maintain plant post warranty, is to know what to look for in a construction-biased contract. The focus should be on solutions that are safe but also cost effective. Unfortunately, the complexity of contractual arrangements can work against this, creating potential barriers to plant integrity, safety and reliability. When a site is under construction, little focus can be given to the scope of work for contracted parties during O&M. So, the primary loser here is often the asset


owner. ARMSA Consulting (“ARMSA”), a multi-disciplinary professional services firm, has experienced several on and offshore cases where the O&M service provider has taken a limited view of its role so on the health and safety side, there can be significant ramifications.


STRUCTURED PLANNING


When ARMSA audit O&M performance the first inquiry is generally for sight of the inventory of critical plant items. This enables plant identification, assessment of risks and development of a maintenance strategy. While assets are still under warranty, project owners may not have access to all plant related information, such as design standards. “The OEM tends to hold on to design of equipment and information relating to that – it’s their intellectual property – and this has not been resolved in the market at the moment,” commented Rakesh Maharaj, ARMSA’s Director. “But, at the very least, they should provide sufficient information on plant hazards and associated safety related systems and safety critical devices because those hazards need to be managed.”


BUILDING COMPETENCE


One critical gap is that non-OEM service providers sometimes lack technical competence, so they fail to ask the right questions. This can lead to the quality of


data that is captured being insufficient to develop and improve ongoing operations and maintenance strategies.


CREDIBLE PRINCIPLES


If asset owners fail to take basic steps early on, it can lead to safety and reliability problems in the future as well as spiralling costs. To meet operational challenges all parties involved need to look more closely at how they plan and manage O&M responsibilities. In transitioning into post-warranty period, windfarm owners need to be confident their O&M provider can deliver robust asset management strategies. As in the absence of a more structured approach the safety and reliability of the assets could be at risk.


ASSET MANAGEMENT CERTIFICATE PROGRAMME


To help industry address these challenges, ARMSA invested in the development of an Asset Management Certificate programme designed specifically for the Wind Energy sector. The programme enables delegates to take specific steps in improving their asset management strategies.


Rakesh Maharaj Director


ARMSA Consulting


22


www.windenergynetwork.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68