PREDICTIVE MAINTENANCE


SUPPLYING MORE THAN JUST PARTS


Glasgow based components and consumables supplier, Renewable Parts Ltd, believes in supplying more than just parts. By providing a total supply solution, RPL can ensure, high levels of turbine availability at low and in some cases completely predictable cost.


WORKING IN PARTNERSHIP Currently working with RWE at Little Cheyne Court, the largest Nordex N90 site in Europe, RPL has significantly strengthend the supply chain. As Angus D’Arcy Drake, Head of Maintenance & Monitoring Services at RWE Innogy UK Ltd, puts it: “Anticipating emerging parts requirements and acting fast is critical to maximising turbine availability. Throughout our partnership the level of proactivity that RPL has shown has ensured a smooth operation and we have been delighted with the experience.”


INTEGRATION


Crucially this has been achieved by integrating RPL personnel into the onsite team of technicians. By working with the operational team, upcoming work at the site is identified, allowing Renewable Parts Ltd to have any exceptional spares ready for the start of work. This working together approach removes traditional barriers between customer and supplier creating a one team culture, speeding up decision making and providing more opportunity to think ahead.


Technicians have total confidence in availability of parts and consumables because stock at the depot is continuously monitored by an onsite Renewable Parts engineer and maintained at agreed levels.


FEATURE SPONSOR


REGULAR REPORTING


Consumption is regularly reviewed by means of dedicated monthly reporting and quarterly management meetings, allowing the value of stock on the shelf to be optimised. Using this detailed consumption data, managers are able to keep track of individual turbine costs and failure trends, without expending in-house resource.


COMMITMENT


Renewable Parts is committed to taking cost out of the customer’s operation, not only by ensuring availability whilst reducing inventory levels, but also through a refurbishment programme. By having an engineer onsite, the company can determine, through value, usage and technical risk, which components are suitable for refurbishment. The resulting parts repairs enable them to not only deliver appreciable cost savings to the customer but to also form a deeper working relationships with the supply chain to strengthen alignment.


In a world with investors demanding ever higher availability at even lower costs, operators need flexible supply solutions which are more than just parts. It is clear that RPL’s innovative approach is paying dividends at Little Cheyne.


Renewable Parts Ltd


86


www.windenergynetwork.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92