This page contains a Flash digital edition of a book.
SPONSORS OF EAST OF SCOTLAND


OFFSHORE WIND ACCELERATOR WAKES


Oldbaum Services has been elected to provide the LEOSPHERE group Instrument solutions for E.ON and the Carbon Trust as part of the Offshore Wind Accelerator Wakes work stream.


Oldbaum Services are a leading wind energy consultancy have been selected to provide the LiDAR (Light Detecting And Ranging) instrumentation solution for the Offshore Wind Accelerator Wakes Measurement Campaign.


OFFSHORE WAKES AND THEIR IMPACT ON WINDFARM YIELD Hosted and managed by E.On Climate & Renewables on behalf of the Carbon Trust and Offshore Wind Accelerator Partners, this project represents a major effort to fully understand the complex issue of offshore wakes and their impact on wind park yield.


Andy Oldroyd technical Director of Oldbaum said ”This project is at the forefront of the scientific effort to understand the highly complex issue of offshore wakes, their formation, propagation and interaction within wind farms and their subsequent impact on energy production.”


Oldbaum are delighted to have been selected for this prestigious project, calling on our experience and expertise to provide vital data in the effort to understand this complex flow issue”


Stephen Wyatt, Head of Technology Acceleration at the Carbon Trust, added “Wake effects has long been recognised as a vital area of research to the OWA Partners. The Offshore Wind Accelerator Wakes Measurement Campaign being carried out on E.ON’s Rødsand II site, will both increase understanding of the physics behind wake effects, as well as improve prediction accuracy which will reduce financing costs.”


JOINT EFFORT For this project Oldbaum teamed up with Leosphere and Avent Lidar Technology to provide 2 Scanning LiDAR stations (WINDCUBE 200S from LEOSPHERE) and 4 Nacelle LiDAR systems (2Fore and 2Aft looking WIND IRIS from Avent).


“This is a really pioneering project” said Alexandre Sauvage, President of LEOSPHERE. “Thanks to the combination of the WIND IRIS nacelle mounted LiDAR measuring capabilities with the WINDCUBE 200S 3D long range LiDAR ones, OWA will get for the first time a comprehensive characterisation of wake effects, at short and long distances. This represents a key leverage to increase offshore wind farm efficiencies and to reduce costs of wind energy”.


“Building on the measurement programme defined by the Offshore Wind Accelerator Technical Lead, Frazer Nash Consultancy, and E.On Climate and Renewables requirements, Oldbaum felt that a common instrument approach using similar pulsed LiDAR technology would present the best technical solution to the measurement campaign, whilst reducing measurement uncertainty” stated Andy.


“All involved have worked hard to ensure a compressed timeline can be met to start data acquisition this year. This is a very challenging, exciting programme, and we look forward to receiving the first data streams and interrogating them to see what information they contain”.


INDUSTRY BEST PRACTICE The LiDAR systems are currently undergoing pre-deployment certification according to Industry best practice, and will be installed and operational before year end.


Oldbaum www.oldbaumservices.co.uk


88


www.windenergynetwork.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108