This page contains a Flash digital edition of a book.
Success story \\\ Manufacturing \\\


Customer Relationship Management (CRM) functionality. This supports our warranty work by allowing us to track our product serial codes. We believe it to be the best system on the market for this purpose because it allows us to track serial codes, switch the codes to the trailer manufacturer code and then finally to the end user. This gives full traceability of our products from where they originated to the point of use. The added benefit for us is the ability to add more Syspro modules as and when we need them.”


K3 manufacturing expertise speeds start up


The BPW Ltd. assembly plant went live in the summer of 2009. Bringing the plant on stream took four months of intensive work by its project team, which included a dedicated K3 manufacturing expert. He helped steer BPW Ltd. personnel in the necessary direction with them having no experience in manufacturing as their strengths were in sales and distribution.


“With help from K3 we were able to implement the changes in a very short time,” explained Turton. “We had no manufacturing knowledge at all and now we are proficient. Without Syspro and K3 support, we would not have been able to do it. In just four months, we were up and running with the plant and the software was installed and working efficiently. We were very pleased with the outcome.”


He added that BPW Ltd. was fortunate in being able to add


manufacturing to Syspro when it needed it. “It is much more than a standard sales and distribution system, the addition


of our manufacturing function has been seamless,” said Turton. “We now have a fully integrated system that also integrates with our sales management and analysis software.”


The assembly plant is very successful in producing a wide range of standard axles and suspension systems and is able to produce over 70 finished products a day. This far exceeds the expectations of the German parent company, which originally forecast that the plant would produce around 30 axles a day.


www.logisticsit.com





We now have a fully integrated system that also integrates with our sales management and analysis software.”


– Steve Turton, BPW Ltd.


Being able to forward plan using Syspro is enabling this to happen. Turton again: “We are a build-to-order operation. We bring in components from Germany from which we assemble the axles and suspension systems. We have to forward plan quite a way ahead of our delivery dates to get the products to the customer on time. This takes a lot of skill and that is why Syspro is important; it holds the information we need and makes it visible.”


Turton continued: “From our customer orders we decide what is to be built here and what needs to be manufactured in Germany. The Materials Required Planning (MRP) function of the system aids the production of the Bills of Materials (BOM). This streamlines the order process for both finished product and components coming from Germany. The system also makes it easier to manage which finished products will go direct to the customer and which will come here for us to despatch.”


Regardless of where items are stored, Syspro gives complete visibility and allows precise stock control. “The software allows us to transfer stock from one warehouse to another even if the warehouse is off site,” said Turton. “It allows us to control what is


in-first-out costing system for spare parts and for axles built in Germany. The software copes very well with both.”


Syspro also provides accurate and essential information for the sales analysis software of BPW Ltd. “Our sales analysis software takes the information directly from Syspro,” Turton pointed out. “This gives us the ability to monitor costs and margins by product group. This information also lets us see the margins we make on each delivery we make to the customer by product. This ability to see the total cost of sales is important and gives us far greater control over how we break down our margin analysis between goods produced here and those brought in from Germany. It also allows us to analyse our spare parts sales.”


Service and support


Turton concluded: “We are very pleased with K3 and Syspro. The service and support from K3 is excellent. The company also invests considerably in software development and each year there are important enhancements to the product to help customers get more from their systems. We need to be at the leading edge of our own market and K3’s continuous development of Syspro will help keep us out in front by making us more competitive.” 


happening, keeping us in charge of when we are able to deliver to the customer.”


Dual planning, dual costing


BPW Ltd. clearly demonstrates not only how Syspro provides the ability to dual plan, but also how it provides dual costing management and control, as Turton explains: “With the addition of the assembly plant we operate two types of costing; standard costing for products built in the UK and a first-


March 2011


MANUFACTURING &LOGISTICS


IT 25


Axles and suspension systems provided by BPW Ltd. are helping to keep the goods rolling for major retailers such as Tesco, Sainsbury’s, Asda, John Lewis and Aldi.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56