This page contains a Flash digital edition of a book.
Ongoing Developments and Operations In almost every area of oil and gas activity, CT is a fi rmly established technology for remedial well interventions and the drilling and completion of new wells (previous page and right). CT allows selective placement and accurate controlled delivery of chemical, acid and fracturing treat- ments. It is also used to clean, protect or replace existing tubulars. CT versatility is especially valu- able in wellbores with questionable tubular integrity, or wells requiring fl ow conformance for water and gas control, and also for sand control. CT services can be executed effi ciently under


almost any condition, including live wells, while ensuring optimal well control. In addition, CT allows real-time communication with downhole tools conveyed to control treatments, manipulate hardware and analyze reservoir properties. This technology has proved effective for developing low-permeability, low-pressure and mature or depleted reservoirs in which conventional tech- niques fail to achieve commercial production. Upgrading existing tools and techniques while developing new technology remains a key to CT success as does improving our understand- ing of coiled tubing behavior and risk assessment. Combining multiple systems or pro- cesses yields new and unique solutions to old well-intervention challenges. For example, Schlumberger has made further advances in sys- tems for operating CT units from anchored


fl oating vessels and platforms, and recently fi eld tested a new through-tubing gravel-pack system with reentry capabilities.26 Deeper, higher pressure, higher temperature and extended-reach wells increase the complex- ity of CT operations. In 1995, Schlumberger began using simulators in training centers at Kellyville, Oklahoma, USA, and Bottesford, England,


to familiarize employees with


CT equipment, operations and contingency pro- cedures. Capitalizing on extensive simulator experience and continual improvement in portable computer capabilities, Schlumberger followed this with development of portable simulation-based training. The resulting CT Sim computer-based learn- ing resource presents concepts, equipment functionality and operating procedures. The intent was to provide prerequisite knowledge and practice in order to optimize training at the learning centers or in fi eld locations. Scheduled for release in 2004, the CT Sim program will be a key component for training and recertifi cation of CT supervisors and engineers.


> Coiled tubing pilot drilling program in Colombia’s Cusiana  eld.


Schlumberger continues to develop and


refi ne equipment, procedures and techniques to extend the operating pressure ranges for CT jobs, including high-pressure applications up to 13,500 psi [93.1 MPa]. Also in development are spoolable CT connectors and completion equip- ment, including gas-lift valves, which will facilitate operations in logistically challenging areas, such as mature offshore platforms and remote or environmentally sensitive locations. However, not all well-intervention applica-


tions involve pushing the limits of CT tubular capabilities, equipment and tools. CT continues to be a workhorse for many conventional well operations and services. Petroleum Development of Oman (PDO) used CT to optimize plug and abandonment (P&A) practices.27


Rigless methods with new cement and sealant technologies minimize costs while ensur- ing long-term environmental protection in these once prolifi c oil wells.28


CT saved up to 30% com-


pared with P&A campaigns using conventional drilling and workover rigs. This represented a total savings of more than US$ 5 million in a recent 60-well program.29


As CT reliability improves, operators are reevaluating candidate wells and targeting more completions for through-tubing or concentric remedial interventions, including some wells pre- viously considered too risky for CT operations. To that end, CT equipment and string reliability con- tinue to be the focus of efforts to reduce downhole risks and decrease operational failures. Schlumberger is committed to maintaining technical leadership in CT services through cost- effective solutions that address operator needs from the most basic to the most complicated applications, with skilled personnel to imple- ment them. The goal is to assure optimal well and reservoir performance through safe and effi - cient operations.


— MET


Spring 2004


57


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76