TRAINING
FANS
"The Conex Bänninger training
Mike Lucken
size with a proper pipe cutter is essential. The tube then needs to be deburred inside and out to ensure no debris is left in the pipework and that it has a smooth fi nish. The next step is to use a depth gauge or the fi tting socket to mark the insertion depth, simply insert the tube in the gauge or fi tting and mark the depth of the tube with a marker pen. This gives a visual guide that the tube is fully seated in the socket at the correct depth.
“Once the tube has been marked to the correct depth, take the fi tting and put it into the jaw. Press the joint using a press
Download the ACR News app today
machine to achieve the perfect joint then mark the fi tting to so that the fi tting can be identifi ed as being pressed.” There are several major advantages to using >B<
MaxiPro, which admirably performs in the higher pressures that ACR applications tend to operate in – up to a maximum operating pressure of 48 bar at 121°C, with a maximum operating temperature range of -40°C to 121°C. The key product benefi ts include: fl ame-free, lower installation costs, higher productivity and a high degree of fl exibility including being able to install within tight spaces.
session was informative, and we were able to learn about the whole process of installing the >B< MaxiPro."
Darwin Siooito
www.acr-news.com • February 2024 17
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40