East Anglia ONE Offshore Windfarm Generation Assets Monitoring Plan


September, 2016


Date


Description


18th December 2015 Response from the MMO confirming acceptance of the proposals set out in the ‘Aerial Digital’ plan and setting out a number of points that must be addressed in a more detailed methodology, to be submitted after a contractor has been appointed


6th April 2016 15th April 2016 19th July 2016


28th July 2016 3rd August 2016


Aerial Survey Power Analysis submitted to Natural England (Appendix B) – this document provided a summary of the methods and results of preliminary power analyses conducted to help guide the design of aerial surveys


Meeting with Natural England to discuss Aerial Survey Power Analysis results. Natural England provided positive feedback and agreed in principle with the conclusions of the analysis.


Aerial survey contractor method statement submitted to Natural England for comment (written in consideration of conclusions of the Aerial Survey Power Analysis)


Response from Natural England regarding the aerial survey contractor method statement


EAOL response to comments received from Natural England on methodology proposed by survey contractor (comments incorporated into this document). Submitted via e-mail.


Page 17


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35