Traffic Data Baseline Road Links


Total flows


A14 - Junctions 51 to 52


Paper Mill Lane (North of Cable Route), Bramford


B1113, Bramford Road A1156, Castle Hill


A14 - South of junction 52 A12 - South west of A14 A14 - East of River Orwell


% HGV


Baseline + Cable route


Total flows


% HGV


Baseline + Converter station


Total flows


% HGV


51105 15.4 51228 15.6 51114 15.4 1780 16.5 2262 31.9 1780 16.5 7514


29908


0 0


0 7780 30135 49195


0 0


0 7742 30028 48648


0 0


49166 20.9 49576 21.3 49266 20.9 48592


0 58354 22.4 58939 22.8 58396 22.4


B1077 - North of Westerfield 3647 8.9 3873 10.1 3647 8.9 Ipswich Road, Grundisburgh 1477 The Street, Little Bealings A1214, Kesgrave


9


A12 - North of Woodbridge B1438, Woodbridge


Top Street, Woodbridge


21213 30751 11031 7575


A12 - Between A1214 & A14 37172 Ipswich Road, Waldringfield A14 - East of A12 Trimley Road, Kirton B1083, Sutton


Table 1 1558 12.9 1477


21751 30897 11152


0 0 0


0


21213 30751 11051


37192 9


475 11.8 475 11.8 475 11.8 0 0 0 5 0


9276 12.7 7575 38092


0 0 0 5 0


2341 9.6 2422 12.1 2341 9.6 35174 16.3 35505 16.7 35196 16.3 3701 7.5 3862


11 3701 7.5 2948 17.2 3095 20.6 2948 17.2 Traffic Flows and Assessment Results


88 88 88


48 88 88 88 48 48 48 48 88 48 48 88 88 88 48 48


Speed (kmph)


Increases in


Baseline Traffic with Construction


HGV / Speed CRTN Correction


Cabling Converter station Baseline


0%


27% 4%


1% 1% 1% 1% 6% 5% 0% 3% 0% 1%


22% 2% 3% 1% 4% 5%


0% 0% 3%


0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%


4.1 4.2 1.4


-3.0 4.8 1.4 4.9


-0.2 -0.2 0.5


-3.0 1.4


-3.0 -1.2 1.4 3.3 4.2


-0.5 1.4


Baseline + Cable route


4.1 5.9 1.4


-3.0 4.8 1.4 5.0 0.1 0.7 0.5


-3.0 1.4


-3.0 0.6 1.4 3.6 4.3 0.3 1.9


Baseline + Converter station


4.1 4.2 1.4


-3.0 4.8 1.4 4.9


-0.2 -0.2 0.5


-3.0 1.4


-3.0 -1.2 1.4 3.3 4.2


-0.5 1.4


LA10 Calculation + Correction Increases in LA10Traffic Noise Level


Baseline


80.3 65.8 69.2


70.8 80.8 77.3 81.7 64.5 60.6 56.3 69.3 75.3 66.5 66.7 76.2 66.0 78.8 64.3 65.2


Baseline + Cable route


80.3 68.5 69.4


70.9 80.9 77.4 81.8 65.1 61.7 56.3 69.4 75.4 66.5 69.4 76.3 66.6 78.9 65.3 66.0


Baseline + Converter station


80.3 65.8 69.3


70.8 80.8 77.3 81.7 64.5 60.6 56.3 69.3 75.3 66.5 66.7 76.2 66.0 78.8 64.3 65.2


Cabling Converter Station


0.0


+2.7 +0.2


0.0


+0.1 +0.1 +0.1 +0.5 +1.1 0.0


+0.1 0.0 0.0


+2.7 +0.1 +0.5 +0.1 +1.0 +0.7


0.0 0.0


+0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0


EAOW Noise Prediction Methodology P41388


4


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46