Loc Daytime
R1 (CS) 29/9/11 13:25 R2 (CS) 29/9/11 16:10 R3 (CS) 29/9/11 14:48 Night time
R1 (CS) 30/9/11 02:27 R2 (CS) 30/9/11 03:04 R3 (CS) 30/9/11 03:28
1:00 1:00 1:00
1:00 1:00 1:00
Date
Start
Duration (hr:min)
LAeq dB
44.0 45.2 41.3 dB
32.6 26.9 35.7
70.2 68.2 64.2
68.2 61.7 67.0
Table A1-2 Attended Monitoring Results – Converter Station
The results of the measurements were used to inform the assessment criteria for both the construction of the electrical transmission works (Landfall, Cable Route, HDD), the converter station and the operation of the Converter Station.
45.3 47.8 44.1
33.2 28.5 37.6
32.4 35.8 37.4
26.3 21.6 27.7
LAF(max)
LA10
LA90
EAOW
Noise Monitoring Results P41388
2
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46