This page contains a Flash digital edition of a book.
Loc Daytime


R1 (CS) 29/9/11 13:25 R2 (CS) 29/9/11 16:10 R3 (CS) 29/9/11 14:48 Night time


R1 (CS) 30/9/11 02:27 R2 (CS) 30/9/11 03:04 R3 (CS) 30/9/11 03:28


1:00 1:00 1:00


1:00 1:00 1:00


Date


Start


Duration (hr:min)


LAeq dB


44.0 45.2 41.3 dB


32.6 26.9 35.7


70.2 68.2 64.2


68.2 61.7 67.0


Table A1-2 Attended Monitoring Results – Converter Station


The results of the measurements were used to inform the assessment criteria for both the construction of the electrical transmission works (Landfall, Cable Route, HDD), the converter station and the operation of the Converter Station.


45.3 47.8 44.1


33.2 28.5 37.6


32.4 35.8 37.4


26.3 21.6 27.7


LAF(max)


LA10


LA90


EAOW


Noise Monitoring Results P41388


2


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46